|
FWFD issued a shelter-in-place order for residents in areas 5.5 miles to the south.
When OSC Scott Harris and five START contractors arrived on site, several FWFD units were battling intense flames, smoke and explosions. The fire was producing a dark, highly visible plume, drifting to the south, pushed by a 5-10 mph north wind.
After checking in with the FWFD-ICS, EPA representatives initiated air monitoring at 1700 hours approximately one mile downwind (south). Five monitoring locations were established; four on the border of the industrial complex and the nearest downwind residential neighborhood and one at the nearest downgradiant storm water outfall. The PRP contractor, Hultcher Services, created an earthen berm at the stormwater outfall to contain fire water runnoff. That structure was later reinforced and enlarged, and another structure added downstream when flow exceeded the original capacity.
A fire was reported in the stormwater system, and the pH of the leading edge of the runoff in that system was reported to be 0-1. Air monitoring at the discharge point from the system, near a residential area, indicated no elevated levels and no explosivity.
ASPECT maintained contact with OSC Harris, reporting low concentrations of iosbutylene, glycol, various alcohols, p-xylene and formic acid leaving the site in the plume. That information was very useful to responders trying to (1) determine what materials and concentrations to model, (2) evaluate whether the shelter-in-place was appropriate and (3) focus the air monitoring effort. ASPECT was also able to penetrate the flight-restriction area and provide excellent video and high-resolution photos of the incident.
Fallout of heavy, black ash was reported over one mile from the site.
A storage tank BLEVE sent the tank across the street and onto an adjoining building.
At 1645 hours FWFD reported the fire to be under control and turned control of site over to PRP and PRP-led contractors. At 1900 hours, EPA terminated all air monitoring locations. All stations reported levels at background for volatile organic compounds, chlorinated compounds, phosphine, nitrogen dioxides, sulfur dioxides and amines.
It appears that the site was completely destroyed, along with the contents of all containers.
|