United
States Environmental Protection Agency
Region VI
POLLUTION REPORT
|
| Date: |
Tuesday, August 16, 2005
|
| From: |
Scott Harris, Ph.D.
|
| To: |
Debbie Dietrich, Office of Emergency Management
|
Ragan Broyles, Response and Prevention Branch
|
|
Subject:
|
Containment Dams Removed
Valley Solvent and Chemical Fire
2573 N.E. 33rd St.,
Fort Worth, TX
Latitude: 32.8050000 Longitude: -97.3119000
|
| POLREP No.: |
6
|
Site #:
|
A601
|
| Reporting Period: |
08/06-16/2005
|
D.O. #:
|
|
| Start Date: |
|
Response Authority:
|
CERCLA
|
Mob Date: |
7/28/2005
|
Response Type:
|
Emergency
|
| Demob Date: |
|
NPL Status:
|
Non NPL
|
| Completion Date: |
|
Incident Category:
|
Removal Action
|
| CERCLIS ID #: |
|
Contract #
|
|
| RCRIS ID #: |
|
|
|
On July 28, 2005, EPA Region 6 was notified of a large fire and heavy plume at the Valley Solvent and Chemical Company, Fort Worth, Tarrant County, Texas. Several explosions, injuries and nearby evacuations were reported. The smoke could be seen for 30+ miles.
Valley Solvent and Chemical is a chemical repackaging facility located approximately four miles north of downtown Fort Worth. Valley maintains a large inventory and variety of hazardous substances in tanks, drums and smaller containers. The site is located in an industrial complex with adjacent residential areas located less than one mile to the south and west. The cause remains under investigation.
|
|
Contractors have completed removal of contaminated runoff water from the storm water system. They continue to analyze, pretreat and batch discharge to the POTW. Organics, pH, metals and foaming remain the primary concerns.
Both containment dams have been removed.
START is conducting an SPCC review.
|
|
Numerous fractionation tanks remain staged, and continue pretreating contaminated runnoff for discharge to POTW.
TCEQ is coordinating site remediation.
|
|
Complete water processing and disposal
Complete site remediation
Determine applicability of SPCC requirements
|
|
Concerns over potential off-spec discharges
|
| |
Budgeted |
Total To Date |
Remaining |
% Remaining |
|
Extramural Costs
|
| RST/START |
$20,000.00 |
$0.00 |
$20,000.00 |
100.00% |
|
Intramural Costs
|
| |
| Total Site Costs |
$20,000.00 |
$0.00 |
$20,000.00 |
100.00% |
* The above accounting of expenditures is an estimate based on figures known to the OSC at the time this report was written. The OSC does not necessarily receive specific figures on final payments made to any contractor(s). Other financial data which the OSC must rely upon may not be entirely up-to-date. The cost accounting provided in this report does not necessarily represent an exact monetary figure which the government may include in any claim for cost recovery.
response.epa.gov/ValleySite
POLREP #6 Last Updated 8/16/2005
|