United States Environmental Protection Agency
Region I
POLLUTION REPORT



Date:
Monday, November 21, 2005
From:
Catherine Young


Subject: 

Electrosonics Removal Site Update
Electrosonics Site
Route 9A, Chesterfield, NH


POLREP No.:
3
Site #:
019N
Reporting Period:
D.O. #:
Start Date:
11/29/2004
Response Authority:
CERCLA
Mob Date:
11/29/2004
Response Type:
Time-Critical
Demob Date:
 
NPL Status:
NPL
Completion Date:
 
Incident Category:
Removal Action
CERCLIS ID #:
Contract #
RCRIS ID #:
 

Site Description

The approximately 0.4 acre site is located in a mixed commercial and residential area in Chesterfield, NH. The Site is comprised of two separate and abutting parcels, identified as Lots# 5 and 5.1 of Map 6A, Block D at the Chesterfield Tax Assessor's Office. The Site includes two main commercial buildings, one small building that formerly housed a portion of an industrial wastewater treatment facility and an on-site septic leachfield which was used by both parcels.

Historical records indicate the primary building was constructed around 1810 and was originally used for manufacturing textile and wood-based products until the 1930's. During the 1940's the buildings were used as a warehouse until it was sold to Electrosonics in 1966. Electrosonics manufactured printed circuit boards until 1984.  It has been reported that Electrosonics discharged untreated wastewater contaminated with various volatile organic compounds (VOC's) and heavy metals into an on-site septic leachfield. This caused the leachfield to suffer frequent surface breakouts that resulted in waste effluent flows into Partridge Brook.  Other reports have indicated that portions of the wastewater were discharged into the earthen basement floor of the original mill building. It is believed that for several years, after a newly built wastewater treatment facility was brought on-line in 1974, there were no discharges into the ground or the Partridge Brook.

After circuit board manufacturing operations ceased in 1984, different portions of the former Electrosonics facility were used for warehouse and office space by several owners/operators.

During the 1980's and 1990's, the New Hampshire Department of Environmental Services (DES) conducted several inspections and concluded that the leachfield periodically failed and resulted in discharges to Partridge Brook. DES sampling of on-site monitoring wells detected elevated levels of VOC's in the groundwater. The contaminated soils at the Electrosonics site have been identified as the source of the VOC's in the groundwater. DES installed point-of-entry (POE) treatment systems on four homes near the site which draw their drinking water from private wells. The POE systems are currently still operating in the four homes.


Current Activities

After site activities were delayed approximately 9 months during consultation meetings with the NH Division of Historical Resources and the Advisory Council on Historic Preservation, a Memorandum of Agreement was reached on September 23, 2005. Upon signature of the MOA, final recordation activities were completed and removal activities resumed on October 24, 2005. An Asbestos survey and abatement was completed prior to the start of building demolition activities.

Building demolition and disposal of the materials was completed on November 14, 2005. EPA secured the site for winter hiatus and demobilized from the site on November 16, 2005. Remobilization is planned for the spring of 2006 to complete removal of the contaminated soils.


Planned Removal Actions

Removal of contaminated soils is planned for June 2006. All soils will be transported to a licensed disposal facility. The property will be regraded and seeded prior to final removal activities at the site.


Estimated Costs *
  Budgeted Total To Date Remaining % Remaining
Extramural Costs
ERRS - Cleanup Contractor $499,300.00 $213,165.00 $286,135.00 57.31%
RST/START $100,000.00 $93,938.00 $6,062.00 6.06%
Intramural Costs
USEPA - Direct (Region, HQ) $70,000.00 $70,000.00 $0.00 0.00%
USEPA - InDirect $212,040.00 $75,000.00 $137,040.00 64.63%
 
Total Site Costs $881,340.00 $452,103.00 $429,237.00 48.70%

* The above accounting of expenditures is an estimate based on figures known to the OSC at the time this report was written. The OSC does not necessarily receive specific figures on final payments made to any contractor(s). Other financial data which the OSC must rely upon may not be entirely up-to-date. The cost accounting provided in this report does not necessarily represent an exact monetary figure which the government may include in any claim for cost recovery.


response.epa.gov/Electrosonics

POLREP #3 Last Updated 7/3/2006