United
States Environmental Protection Agency
Region I
POLLUTION REPORT
|
| Date: |
Thursday, January 5, 2006
|
| From: |
Mike Nalipinski
|
|
Subject:
|
First and Final
Abbot School
25 Depot Road,
Westford, MA
Latitude: 42.5883000 Longitude: -71.4319000
|
| POLREP No.: |
1
|
Site #:
|
|
| Reporting Period: |
|
D.O. #:
|
|
| Start Date: |
1/4/2006
|
Response Authority:
|
OPA
|
Mob Date: |
1/4/2006
|
Response Type:
|
Emergency
|
| Demob Date: |
1/4/2006
|
NPL Status:
|
Non NPL
|
| Completion Date: |
1/4/2006
|
Incident Category:
|
Removal Assessment
|
| CERCLIS ID #: |
|
Contract #
|
|
| RCRIS ID #: |
|
Reimbursable Account #
|
|
| FPN# |
|
|
|
The 10,000 gallon underground storage tank (UST) failed, realeasing an estimated 1500 gallons of #4 heating oil into the soils, boiler room, catch basin to a storm water system into the proximinal stream and wetland systems.
|
|
The Town of Westford hired ENPRO Environmental which conducted the inital emergency response activities which consisted of containing the oil, removing the tank, and conducting air monitoirng in the school. ENPRO is currently conducting extent of contamination investigations including the installation of peizometers, coring thru the basement walls, and maintaining the vac truck at the outfall to the swale..
|
|
During the first week January ENPRO is planning to collect the booms/sorbent pads from the swale,then pressure wash the rocks and collect product from the oiled areas.
|
|
Once the extent of contamiantion has been determined the Town, and under supervision of the State DEP, will excavate the contamined soils along the base of the building.
|
|
The DEP and the Town responded to the release on December 27, 2005. EPA was notified on January 5, 2006.
|
| |
Budgeted |
Total To Date |
Remaining |
% Remaining |
|
Extramural Costs
|
|
Intramural Costs
|
| |
| Total Site Costs |
$0.00 |
$0.00 |
$0.00 |
0.00% |
* The above accounting of expenditures is an estimate based on figures known to the OSC at the time this report was written. The OSC does not necessarily receive specific figures on final payments made to any contractor(s). Other financial data which the OSC must rely upon may not be entirely up-to-date. The cost accounting provided in this report does not necessarily represent an exact monetary figure which the government may include in any claim for cost recovery.
response.epa.gov/AbbotSchool
POLREP #1 Last Updated 10/16/2006
|