The OMC Site is located in the city of Waukegan, Lake County, Illinois. The site coordinates are Latitude 42◦22’8.6” North and Longitude 87◦49’10.1” West.
The OMC Plant 2 property consists of 65 acres, on which are located the approximately 1,000,000 square foot former manufacturing plant building and several parking lot areas to the south and north of the building. The Plant 2 Site is bordered by the North Ditch and North Shore Sanitary District to the north, the public beaches of Lake Michigan to the east, by Seahorse Drive and Larsen Marine to the south, and a railroad to the west.
On December 22, 2000, OMC filed for Chapter 11 federal bankruptcy protection and ceased all operations. Bombardier Motor Corporation, a Canadian company, bought OMC product lines and some assets in Plant 2 of February 5, 2001. Bombardier planned to sell, or move to a new facility in Wisconsin, man of the assets it bought. On August 9, 2002, the court entered an order converting the Debtor’s case to a Chapter 7 case under the bankruptcy code. The court-appointed Trustee filed a petition to abandon the property on November 15, 2001
As a result of this pending abandonment and a Resource, Conservation and Recovery Act (RCRA) Preliminary Assessment/Visual Site Inspection (PA/VSI) done at the site in July 2001, in which many hazardous substances were found at the site, the Emergency Response Branch was asked to perform a comprehensive site investigation. This inspection would address all avenues of exposure to determine if an imminent and substantial endangerment to public health and/or the environment existed.
Plant 2 existed for over 50 years, during which it housed various aspects of the manufacture of marine engines. Throughout the 60’s and into the 70’s, the plant used hydraulic oil containing PCBs in its die casting operations. One of many locations where the oil was recovered from operations was the chip wringer area, where aluminum chips were removed from the oil. In addition, the plant used large amounts of trichloroethylene (TCE) as a degreaser, and a very large degreaser unit once operated at the site.
On March 4 through 6, 2002, the U.S. EPA and its contractor collected numerous samples from the ambient air, drums and tanks, monitoring wells, sediment from the North Ditch, soil, insulating materials, and surface area (wipe samples) in the plant. Results of the inspection showed the presence of hazardous materials and wastes, including radioactive materials, hydrofluoric acid, metallic mercury, flammable liquids, chlorinated solvents, PCBs (in two dozen large electrical transformers), and asbestos.
As a result of the analytical results of the samples described above that were written in the report entitled “Outboard Marine Corporation: Discovery Site Visit Report”, U.S. Department of Justice (DOJ), U.S. EPA’s Office of Regional Counsel, along with the State of Illinois Attorney General’s Office and the OMC Trustee agreed on a settlement which required the Trustee to take certain actions before it could abandon the site. The required actions included removal of all drums, tanks, and containers, draining and flushing transformers, draining and disposal of all machines, removal of all batteries, and decontamination of all die cast and metal working machines.
Plant 2 was declared abandoned on December 10, 2002 by the Bankruptcy Court.
U.S. EPA conducted waste removal at Plant 2 over a nine week period beginning in May 2003. The completed removal activities included waste removal, floor decontamination, tunnel inspections, soil and groundwater sampling, asbestos removal, and transformer draining. Based on the analytical results from samples collected during the discovery site visit, it was determined that the majority of PCB contamination existed in the older portions of the plant (western portion). Tunnels in the old die cast area were inspected and videotaped to document potential contamination sources. No substantial contaminant releases to the environment were observed in the tunnels. Soil and groundwater were sampled during U.S. EPA removal activities to document releases of contaminants to the environment. Transformers were drained and left disconnected.
Air sampling was conducted to determine air quality inside the Plant 2 building and showed that PCB concentrations in air were still elevated. U.S. EPA removal activities are documented in the report entitled “EPA Removal Action Summary Report” dated December 12, 2003.
Upon abandonment of the Plant 2 property by the OMC Trust on December 10, 2002, U.S. EPA arranged for operation and maintenance of the sediment containment cell treatment system for a period of one year. As of December 10, 2003, arrangements with the City of Waukegan were required to continue these operations.
In 2004, the City of Waukegan contracted Deigan and Associates to perform an environmental site investigation of the easternmost portion of the OMC Plant #2, next to the Lake Michigan shoreline. The sampling area is approximately 13 acres located along the easternmost side of the OMC Plant #2 property. Deigan set up a grid pattern of surface and subsurface borings. Deigan collected soil, sediment, and groundwater samples in July 2004, October 2004, and May 2005. Nine sediment samples were collected from the North Ditch and five samples from the South Ditch. Soil PCB contamination was found in concentrations ranging from 1.2 to 14,000 milligrams per kilogram (mg/kg). PCB contamination was found in sediments at concentrations ranging from 0.068 to 150 mg/kg. The highest soil concentrations were found in the northwest corner of the site near the North Ditch and the east sediment containment cell.
In response to the PCB contamination in the lakefront area, the U.S. EPA and its contractor conducted an environmental assessment to confirm the contamination and further define the extent of PCB contamination. The extent of contamination appeared to be defined along the site fence on the eastern edge of the Plant 2 property, between the east containment cell and the Lake Michigan shore, running south of the North Ditch about 400 feet. Several state-listed endangered plant species were identified by Deigan in the areas to be excavated. U.S. EPA solicited Illinois Department of Natural Resources (IDNR) for guidance on how to preserve state-endangered grass plants during excavation and followed IDNR’s process for “endangered species consultation”. U.S. EPA START contractor met with the local botanist who had inventoried the local plant species for the IDNR and City of Waukegan to delineate the locations of state-endangered grass plants. The local botanist and IDNR agents provided guidance and methods to protect endangered plants in the excavation areas.
|