United States Environmental Protection Agency
Region V
POLLUTION REPORT



Date:
Wednesday, March 8, 2006
From:
Jon Gulch

To:
Sam Borries, U.S. EPA
Jason El-Zein, U.S. EPA
Carl Norman, U.S. EPA
Mindy Clements, U.S. EPA
Beverly Kush, U.S. EPA
Tom Krueger, U.S. EPA-ORC
Randa Bishlawi, U.S. EPA
Valencia Darby, Department of Interior
Joe Ulfig, U.S. EPA
Thomas Marks, U.S. EPA
Mick Hans, U.S. EPA
John Glover, U.S. EPA
Isalee Coleman, U.S. EPA
Yolanda Bouchee-Cureton, U.S. EPA
Carol Ropski, U.S. EPA
Barbara Carr, U.S. EPA
John Hahn, USCG
Michelle Bas, USCG
Patricia Cooley, USCG
Duty Officer, USCG
Scott Shane, Ohio EPA
Scott Nally, OEPA
Don Bussey, EPA
Mike Gerber, Ohio EPA
Kevin Clouse, Ohio EPA
Timothy Murphy, City of Toledo
U.S. Coast Guard Case Officer, USCG
Alex Tzallas, US EPA

Subject: 

Continuation of PRP Removal Activities
Delta Fuels
1820 Front St, Toledo, OH
Latitude: 41.6586000
Longitude: -83.5047000


POLREP No.:
9
Site #:
Z5FG
Reporting Period:
2-18-06 to 3-24-06
D.O. #:
Start Date:
11/29/2005
Response Authority:
OPA
Mob Date:
11/29/2005
Response Type:
Emergency
Demob Date:
 
NPL Status:
Non NPL
Completion Date:
 
Incident Category:
Removal Action
CERCLIS ID #:
Contract #
RCRIS ID #:
Reimbursable Account #
FPN#
E06502
 

Site Description

See POLREP #1 for a full description of the Site.


Current Activities

From February 18 - March 24, the PRP contractor addressed dewatering of the site through the use of vacuum trucks at various locations around the site.  Locations included the storm sewer system that runs parallel to the ODOT construction site for I-280; within the mass excavation; and on-site in the tank farm.  

From February 18 - March 7, a PRP contractor monitored the perimeter of the site for exposure to petroleum/gasoline vapors with stationary monitoring equipment.  Monitoring will resume when site activities increase.

On January 25, the PRP contractor began discharging pre-treated storm water and groundwater from the on-site pre-treatement plant.  The original discharge rate was 52 gpm.  The discharge rate was raised to 100 gpm by the City of Toledo on February 8, 2006.  The PRP contractor is providing analytical data to the City of Toledo Division of Environmental Services.

From February 18 to March 24, limited activities by the PRP contractor were performed on-site. The PRP contractor continued to treat, discharge and record the on-site treated water discharge to the Front Street Sanitary Sewer main.


Planned Removal Actions

Install a duel (water and gas) Vapor Recovery System along the ODOT storm sewer system both north and south of the mass excavation.

Continue collection and removal of on-site liquids contaminated with petroleum.

Start on-site remediation activities which will include surface soil removal, removal of the temporary clay barrier wall, removal of the contaminated dike wall along the east side of the tank farm,  installation of a new dike wall along the east side of the tank farm, and installation of an impermeable barrier along the inside of the tank farm.


Next Steps

- The PRP contractor will continue storm water management/collection and sewer monitoring activities.

- The PRP contractor will resume monitoring the air around the perimeter of the facility and in the adjoining neighborhood.

- The PRP contractor will continue to treat and discharge water collected on-site in the waste water treatment system.

- The PRP contractor will establish and submit to the EPA proposals for the removal of contaminated soils on-site.

- The PRP contractor will submit a work plan addressing the remediation of the site as well as bring the site up to the levels as required by the SPCC legislation.


Key Issues

As of January 24, 2006 - 19,909 gallons of product have been recovered.

The plug of the storm sewers located at the Maumee River was pulled on Friday January 13, 2006.  

As of January 13, 2006 - 23,163.85 tons of contaminated soils were sent to the Evergreen Landfill for reclaiming or disposal.  Some off-site contaminated soils are still remaining on the project site waiting to be sent to the landfill.

As of March 3, 2006 592,819 gallons groundwater was treated on-site and then pumped into the sanitary sewer system for discharge through the City of Oregon Sanitary Wastewater Treatment Plant.

The correct address in previous POLREPS for the wastewater treatment plant should have been: City of Toledo, Division of Water Reclamation, Bay View Wastewater Treatment Plant, 3900 N. Summit Street, Toledo, Ohio 43611.


Disposition of Wastes


Waste Stream Quantity Manifest # Disposal Facility
Groundwater Pre-Treated On-site  18,419 gallons    City of Toledo, Division of Water Reclamation, Bay View Wastewater Treatment Plant, 3900 N. Summit Street, Toledo, Ohio 43611 
Groundwater Pre-Treated On-site  18,400 gallons    City of Toledo, Division of Water Reclamation, Bay View Wastewater Treatment Plant, 3900 N. Summit Street, Toledo, Ohio 43611 
Groundwater Pre-Treated On-site  19,600 gallons    City of Toledo, Division of Water Reclamation, Bay View Wastewater Treatment Plant, 3900 N. Summit Street, Toledo, Ohio 43611 
Groundwater Pre-Treated On-site  19,535 gallons    City of Toledo, Division of Water Reclamation, Bay View Wastewater Treatment Plant, 3900 N. Summit Street, Toledo, Ohio 43611 
Groundwater Pre-Treated On-site  20,465 gallons    City of Toledo, Division of Water Reclamation, Bay View Wastewater Treatment Plant, 3900 N. Summit Street, Toledo, Ohio 43611 
Groundwater Pre-Treated On-site  6,700 gallons    City of Toledo, Division of Water Reclamation, Bay View Wastewater Treatment Plant, 3900 N. Summit Street, Toledo, Ohio 43611 
Groundwater Pre-Treated On-site  13,450 gallons    City of Toledo, Division of Water Reclamation, Bay View Wastewater Treatment Plant, 3900 N. Summit Street, Toledo, Ohio 43611 
Groundwater Pre-Treated On-site  20,158 gallons    City of Toledo, Division of Water Reclamation, Bay View Wastewater Treatment Plant, 3900 N. Summit Street, Toledo, Ohio 43611 
Groundwater Pre-Treated On-site  19,703 gallons    City of Toledo, Division of Water Reclamation, Bay View Wastewater Treatment Plant, 3900 N. Summit Street, Toledo, Ohio 43611 
Groundwater Pre-Treated On-site  18,106 gallons    City of Toledo, Division of Water Reclamation, Bay View Wastewater Treatment Plant, 3900 N. Summit Street, Toledo, Ohio 43611 
Groundwater Pre-Treated On-site  60,489 gallons    City of Toledo, Division of Water Reclamation, Bay View Wastewater Treatment Plant, 3900 N. Summit Street, Toledo, Ohio 43611 
Groundwater Pre-Treated On-site  15,850 gallons    City of Toledo, Division of Water Reclamation, Bay View Wastewater Treatment Plant, 3900 N. Summit Street, Toledo, Ohio 43611 
Groundwater Pre-Treated On-site  19,105 gallons    City of Toledo, Division of Water Reclamation, Bay View Wastewater Treatment Plant, 3900 N. Summit Street, Toledo, Ohio 43611 
Groundwater Pre-Treated On-site  48,605 gallons    City of Toledo, Division of Water Reclamation, Bay View Wastewater Treatment Plant, 3900 N. Summit Street, Toledo, Ohio 43611 
Groundwater Pre-Treated On-site  23,946 gallons    City of Toledo, Division of Water Reclamation, Bay View Wastewater Treatment Plant, 3900 N. Summit Street, Toledo, Ohio 43611 
Groundwater Pre-Treated On-site  37,809 gallons    City of Toledo, Division of Water Reclamation, Bay View Wastewater Treatment Plant, 3900 N. Summit Street, Toledo, Ohio 43611 
Non-Hazardous Waste  5,400 gallons  MI10100124  Usher Oil Service, 9000 Roselawn, Detroit, MI 48204 
Non-Hazardous Waste  6,000 gallons  MI9773596  Usher Oil Service, 9000 Roselawn, Detroit, MI 48204 
Non-Hazardous Waste  5,200 gallons  MI9773810  Usher Oil Service, 9000 Roselawn, Detroit, MI 48204 
Non-Hazardous Waste  5,400 gallons  MI10100125  Usher Oil Service, 9000 Roselawn, Detroit, MI 48204 
Non-Hazardous Waste  5,200 gallons  MI9773811  Usher Oil Service, 9000 Roselawn, Detroit, MI 48204 
Non-Hazardous Waste  6,000 gallons  MI9773604  Usher Oil Service, 9000 Roselawn, Detroit, MI 48204 
Non-Hazardous Waste  6,050 gallons  MI9773605  Usher Oil Service, 9000 Roselawn, Detroit, MI 48204 
Non-Hazardous Waste  5,200 gallons  MI9773812  Usher Oil Service, 9000 Roselawn, Detroit, MI 48204 
Non-Hazardous Waste  5,400 gallons  MI10100126  Usher Oil Service, 9000 Roselawn, Detroit, MI 48204 
Groundwater Pre-Treated On-site  42,052 gallons    City of Toledo, Division of Water Reclamation, Bay View Wastewater Treatment Plant, 3900 N. Summit Street, Toledo, Ohio 43611 
Groundwater Pre-Treated On-site  24,224 gallons    City of Toledo, Division of Water Reclamation, Bay View Wastewater Treatment Plant, 3900 N. Summit Street, Toledo, Ohio 43611 
Groundwater Pre-Treated On-site  36,756 gallons    City of Toledo, Division of Water Reclamation, Bay View Wastewater Treatment Plant, 3900 N. Summit Street, Toledo, Ohio 43611 
Groundwater Pre-Treated On-site  23,143 gallons    City of Toledo, Division of Water Reclamation, Bay View Wastewater Treatment Plant, 3900 N. Summit Street, Toledo, Ohio 43611 
Groundwater Pre-Treated On-site  36,597 gallons    City of Toledo, Division of Water Reclamation, Bay View Wastewater Treatment Plant, 3900 N. Summit Street, Toledo, Ohio 43611 
Groundwater Pre-Treated On-site  28,138 gallons    City of Toledo, Division of Water Reclamation, Bay View Wastewater Treatment Plant, 3900 N. Summit Street, Toledo, Ohio 43611 
Groundwater Pre-Treated On-site  45,040 gallons    City of Toledo, Division of Water Reclamation, Bay View Wastewater Treatment Plant, 3900 N. Summit Street, Toledo, Ohio 43611 
Groundwater Pre-Treated On-site  51,358 gallons    City of Toledo, Division of Water Reclamation, Bay View Wastewater Treatment Plant, 3900 N. Summit Street, Toledo, Ohio 43611 


response.epa.gov/deltafuels