United
States Environmental Protection Agency
Region V
POLLUTION REPORT
|
Date: |
Wednesday, March 8, 2006
|
From: |
Jon Gulch
|
To: |
Sam Borries, U.S. EPA
|
Jason El-Zein, U.S. EPA
|
|
Carl Norman, U.S. EPA
|
Mindy Clements, U.S. EPA
|
|
Beverly Kush, U.S. EPA
|
Tom Krueger, U.S. EPA-ORC
|
|
Randa Bishlawi, U.S. EPA
|
Valencia Darby, Department of Interior
|
|
Joe Ulfig, U.S. EPA
|
Thomas Marks, U.S. EPA
|
|
Mick Hans, U.S. EPA
|
John Glover, U.S. EPA
|
|
Isalee Coleman, U.S. EPA
|
Yolanda Bouchee-Cureton, U.S. EPA
|
|
Carol Ropski, U.S. EPA
|
Barbara Carr, U.S. EPA
|
|
John Hahn, USCG
|
Michelle Bas, USCG
|
|
Patricia Cooley, USCG
|
Duty Officer, USCG
|
|
Scott Shane, Ohio EPA
|
Scott Nally, OEPA
|
|
Don Bussey, EPA
|
Mike Gerber, Ohio EPA
|
|
Kevin Clouse, Ohio EPA
|
Timothy Murphy, City of Toledo
|
|
U.S. Coast Guard Case Officer, USCG
|
Alex Tzallas, US EPA
|
Subject:
|
Continuation of PRP Removal Activities
Delta Fuels
1820 Front St,
Toledo, OH
Latitude: 41.6586000 Longitude: -83.5047000
|
POLREP No.: |
9
|
Site #:
|
Z5FG
|
Reporting Period: |
2-18-06 to 3-24-06
|
D.O. #:
|
|
Start Date: |
11/29/2005
|
Response Authority:
|
OPA
|
Mob Date: |
11/29/2005
|
Response Type:
|
Emergency
|
Demob Date: |
|
NPL Status:
|
Non NPL
|
Completion Date: |
|
Incident Category:
|
Removal Action
|
CERCLIS ID #: |
|
Contract #
|
|
RCRIS ID #: |
|
Reimbursable Account #
|
|
FPN# |
E06502
|
|
See POLREP #1 for a full description of the Site.
|
From February 18 - March 24, the PRP contractor addressed dewatering of the site through the use of vacuum trucks at various locations around the site. Locations included the storm sewer system that runs parallel to the ODOT construction site for I-280; within the mass excavation; and on-site in the tank farm.
From February 18 - March 7, a PRP contractor monitored the perimeter of the site for exposure to petroleum/gasoline vapors with stationary monitoring equipment. Monitoring will resume when site activities increase.
On January 25, the PRP contractor began discharging pre-treated storm water and groundwater from the on-site pre-treatement plant. The original discharge rate was 52 gpm. The discharge rate was raised to 100 gpm by the City of Toledo on February 8, 2006. The PRP contractor is providing analytical data to the City of Toledo Division of Environmental Services.
From February 18 to March 24, limited activities by the PRP contractor were performed on-site. The PRP contractor continued to treat, discharge and record the on-site treated water discharge to the Front Street Sanitary Sewer main.
|
Install a duel (water and gas) Vapor Recovery System along the ODOT storm sewer system both north and south of the mass excavation.
Continue collection and removal of on-site liquids contaminated with petroleum.
Start on-site remediation activities which will include surface soil removal, removal of the temporary clay barrier wall, removal of the contaminated dike wall along the east side of the tank farm, installation of a new dike wall along the east side of the tank farm, and installation of an impermeable barrier along the inside of the tank farm.
|
- The PRP contractor will continue storm water management/collection and sewer monitoring activities.
- The PRP contractor will resume monitoring the air around the perimeter of the facility and in the adjoining neighborhood.
- The PRP contractor will continue to treat and discharge water collected on-site in the waste water treatment system.
- The PRP contractor will establish and submit to the EPA proposals for the removal of contaminated soils on-site.
- The PRP contractor will submit a work plan addressing the remediation of the site as well as bring the site up to the levels as required by the SPCC legislation.
|
As of January 24, 2006 - 19,909 gallons of product have been recovered.
The plug of the storm sewers located at the Maumee River was pulled on Friday January 13, 2006.
As of January 13, 2006 - 23,163.85 tons of contaminated soils were sent to the Evergreen Landfill for reclaiming or disposal. Some off-site contaminated soils are still remaining on the project site waiting to be sent to the landfill.
As of March 3, 2006 592,819 gallons groundwater was treated on-site and then pumped into the sanitary sewer system for discharge through the City of Oregon Sanitary Wastewater Treatment Plant.
The correct address in previous POLREPS for the wastewater treatment plant should have been: City of Toledo, Division of Water Reclamation, Bay View Wastewater Treatment Plant, 3900 N. Summit Street, Toledo, Ohio 43611.
|
Waste Stream |
Quantity |
Manifest # |
Disposal Facility |
Groundwater Pre-Treated On-site |
18,419 gallons |
|
City of Toledo, Division of Water Reclamation, Bay View Wastewater Treatment Plant, 3900 N. Summit Street, Toledo, Ohio 43611 |
Groundwater Pre-Treated On-site |
18,400 gallons |
|
City of Toledo, Division of Water Reclamation, Bay View Wastewater Treatment Plant, 3900 N. Summit Street, Toledo, Ohio 43611 |
Groundwater Pre-Treated On-site |
19,600 gallons |
|
City of Toledo, Division of Water Reclamation, Bay View Wastewater Treatment Plant, 3900 N. Summit Street, Toledo, Ohio 43611 |
Groundwater Pre-Treated On-site |
19,535 gallons |
|
City of Toledo, Division of Water Reclamation, Bay View Wastewater Treatment Plant, 3900 N. Summit Street, Toledo, Ohio 43611 |
Groundwater Pre-Treated On-site |
20,465 gallons |
|
City of Toledo, Division of Water Reclamation, Bay View Wastewater Treatment Plant, 3900 N. Summit Street, Toledo, Ohio 43611 |
Groundwater Pre-Treated On-site |
6,700 gallons |
|
City of Toledo, Division of Water Reclamation, Bay View Wastewater Treatment Plant, 3900 N. Summit Street, Toledo, Ohio 43611 |
Groundwater Pre-Treated On-site |
13,450 gallons |
|
City of Toledo, Division of Water Reclamation, Bay View Wastewater Treatment Plant, 3900 N. Summit Street, Toledo, Ohio 43611 |
Groundwater Pre-Treated On-site |
20,158 gallons |
|
City of Toledo, Division of Water Reclamation, Bay View Wastewater Treatment Plant, 3900 N. Summit Street, Toledo, Ohio 43611 |
Groundwater Pre-Treated On-site |
19,703 gallons |
|
City of Toledo, Division of Water Reclamation, Bay View Wastewater Treatment Plant, 3900 N. Summit Street, Toledo, Ohio 43611 |
Groundwater Pre-Treated On-site |
18,106 gallons |
|
City of Toledo, Division of Water Reclamation, Bay View Wastewater Treatment Plant, 3900 N. Summit Street, Toledo, Ohio 43611 |
Groundwater Pre-Treated On-site |
60,489 gallons |
|
City of Toledo, Division of Water Reclamation, Bay View Wastewater Treatment Plant, 3900 N. Summit Street, Toledo, Ohio 43611 |
Groundwater Pre-Treated On-site |
15,850 gallons |
|
City of Toledo, Division of Water Reclamation, Bay View Wastewater Treatment Plant, 3900 N. Summit Street, Toledo, Ohio 43611 |
Groundwater Pre-Treated On-site |
19,105 gallons |
|
City of Toledo, Division of Water Reclamation, Bay View Wastewater Treatment Plant, 3900 N. Summit Street, Toledo, Ohio 43611 |
Groundwater Pre-Treated On-site |
48,605 gallons |
|
City of Toledo, Division of Water Reclamation, Bay View Wastewater Treatment Plant, 3900 N. Summit Street, Toledo, Ohio 43611 |
Groundwater Pre-Treated On-site |
23,946 gallons |
|
City of Toledo, Division of Water Reclamation, Bay View Wastewater Treatment Plant, 3900 N. Summit Street, Toledo, Ohio 43611 |
Groundwater Pre-Treated On-site |
37,809 gallons |
|
City of Toledo, Division of Water Reclamation, Bay View Wastewater Treatment Plant, 3900 N. Summit Street, Toledo, Ohio 43611 |
Non-Hazardous Waste |
5,400 gallons |
MI10100124 |
Usher Oil Service, 9000 Roselawn, Detroit, MI 48204 |
Non-Hazardous Waste |
6,000 gallons |
MI9773596 |
Usher Oil Service, 9000 Roselawn, Detroit, MI 48204 |
Non-Hazardous Waste |
5,200 gallons |
MI9773810 |
Usher Oil Service, 9000 Roselawn, Detroit, MI 48204 |
Non-Hazardous Waste |
5,400 gallons |
MI10100125 |
Usher Oil Service, 9000 Roselawn, Detroit, MI 48204 |
Non-Hazardous Waste |
5,200 gallons |
MI9773811 |
Usher Oil Service, 9000 Roselawn, Detroit, MI 48204 |
Non-Hazardous Waste |
6,000 gallons |
MI9773604 |
Usher Oil Service, 9000 Roselawn, Detroit, MI 48204 |
Non-Hazardous Waste |
6,050 gallons |
MI9773605 |
Usher Oil Service, 9000 Roselawn, Detroit, MI 48204 |
Non-Hazardous Waste |
5,200 gallons |
MI9773812 |
Usher Oil Service, 9000 Roselawn, Detroit, MI 48204 |
Non-Hazardous Waste |
5,400 gallons |
MI10100126 |
Usher Oil Service, 9000 Roselawn, Detroit, MI 48204 |
Groundwater Pre-Treated On-site |
42,052 gallons |
|
City of Toledo, Division of Water Reclamation, Bay View Wastewater Treatment Plant, 3900 N. Summit Street, Toledo, Ohio 43611 |
Groundwater Pre-Treated On-site |
24,224 gallons |
|
City of Toledo, Division of Water Reclamation, Bay View Wastewater Treatment Plant, 3900 N. Summit Street, Toledo, Ohio 43611 |
Groundwater Pre-Treated On-site |
36,756 gallons |
|
City of Toledo, Division of Water Reclamation, Bay View Wastewater Treatment Plant, 3900 N. Summit Street, Toledo, Ohio 43611 |
Groundwater Pre-Treated On-site |
23,143 gallons |
|
City of Toledo, Division of Water Reclamation, Bay View Wastewater Treatment Plant, 3900 N. Summit Street, Toledo, Ohio 43611 |
Groundwater Pre-Treated On-site |
36,597 gallons |
|
City of Toledo, Division of Water Reclamation, Bay View Wastewater Treatment Plant, 3900 N. Summit Street, Toledo, Ohio 43611 |
Groundwater Pre-Treated On-site |
28,138 gallons |
|
City of Toledo, Division of Water Reclamation, Bay View Wastewater Treatment Plant, 3900 N. Summit Street, Toledo, Ohio 43611 |
Groundwater Pre-Treated On-site |
45,040 gallons |
|
City of Toledo, Division of Water Reclamation, Bay View Wastewater Treatment Plant, 3900 N. Summit Street, Toledo, Ohio 43611 |
Groundwater Pre-Treated On-site |
51,358 gallons |
|
City of Toledo, Division of Water Reclamation, Bay View Wastewater Treatment Plant, 3900 N. Summit Street, Toledo, Ohio 43611 |
response.epa.gov/deltafuels
|