During this reporting period the intrusive activities continued within grids:C-5,H-5,K-5,B-2,D-2,D-5,C-2. These activities included magging and flagging of all metal items and the hand shovelling of these flagged materials.
On March 27 an 81mm mortar was found in grid H-5, it was left for a bip on 3/29. The exclusion radius was adjusted to 1395ft. pending the bip and evaluation for HE.
On March 28, START retrieved soil samples from the bip holes from the March 23 bip. they also retrieved a sample from the "rock" for field testing back at their office.
On March 29 a blow in place (bip) of the 81mm round was conducted successfully. The round was determined to contain inert material. This is the third 81mm found to contain inert (non HE) material. The exclusion zone was readjusted back to 236ft.
MPPH RECOVERED DURING WEEK AND DISPOSITION: (SHA-Safe Holding Area) 1-ea 40mm tracer elements, grid C-5b, SHA 1-ea 81mm mortar, unfuzed, grid H5b, SHA 47-ea 40mm tracer elements, grid H5b, SHA 2-ea 40mm tracer elements, grid K5a, SHA 5-ea 40mm tracer elements, grid D-2c, SHA 4-ea 40mm tracer element, grid D2d, SHA 8-ea 40mm tracer elements, grid D-2c, SHA 5-ea 40mm tracer element, grid D2d, SHA 21-ea 40mm tracer elements, grid H5b, SHA
Through Mar 23, 2006 the following stats apply: Total grids - 66 (200x200) Grids cleared - 14.5 Grids Government Qc'd - 14.5 Grids failed - 3 Total Number of digs - 11,342 Number of live MPPEH - 474 Pounds of MPPEH/MD found - 107 Pounds of non MEC scrap found - 1033
Refer to this web site for updated adobe map of site completion activities: https://www.epaosc.net/sites/1299/files/grid%20data%20update%20map%20060331.pdf
|