United States Environmental Protection Agency
Region X
POLLUTION REPORT



Date:
Tuesday, June 3, 2003
From:
Marc Callaghan

To:
Chris Field, USEPA
Terry Eby, USEPA
Mary Matthews, USEPA
Jeff Fowlow, Ecology & Environment
Phyllis Corrasco, USEPR R7
Mike Sibley, USEPA
Jerry Wade, Environmental Quality Management
Mike Szerlog, USEPA
Christine Psyk, USEPA
Chuck Donaldson, ODEQ
Andree Pollock, ODEQ
Ron McManamy, Environmental Quality Management
Dan Opalski, USEPA
Anne Price, ODEQ
Joanne Labaw, USEPA

Subject: 

Interim: Haz-Waste Tracking Polrep 1
Columbia American Plating Company
3003 NW 35th Avenue, Portland, OR
Latitude: 45.5442000
Longitude: -122.7189000


POLREP No.:
5
Site #:
10BD
Reporting Period:
5/30-6/03
D.O. #:
Start Date:
5/13/2003
Response Authority:
CERCLA
Mob Date:
5/15/2003
Response Type:
Emergency
Demob Date:
 
NPL Status:
Non NPL
Completion Date:
 
Incident Category:
Removal Action
CERCLIS ID #:
ORD068788926
Contract #
TDD#0305004
RCRIS ID #:
ORD068788926
 

Site Description

CAPC is a medium sized commercial metal plating facility that performs several kinds or electroplating.  Historically the site has been used for plating operations with zinc, nickel, copper, chromium, silver, gold, tin, and cadmium.  Although processes varied from one metal to another, their general process involved pre-cleaning with caustic solution or solvent, acid pickling (which eliminated scales remaining after cleaning), metal plating, and often a final chromate dip to protect plated surfaces.  Zinc plating is currently the primary process at the site.  The facility employed approximately 13 people.

The primary concern at this Site was the threat of fire and explosion.  The secondary concern is the threat posed by CERCLA hazardous substances and pollutant or contaminants releasing from abandoned drums, Above Ground Storage Tanks (AST's) and process area vats.  Drums and containers onsite will continue to deteriorate over time.  As a result, the potential of solvents, acids, bases, oil, and toxic chemicals to be released to the environment is high.

If further information is needed, please see the previous POLREPS.


Current Activities

Friday, May 30, 2003

EPA OSC (1), USCG PST (1), START (5), and ERRS (7) personnel on site.  START members continued documentation of samples collected on May 29, 2003.  They also reviewed empty or near empty sample jars and recorded the reasons why they were not collected (i.e. empty container, factory sealed container, solidified material, etc.).  If the jar was near empty, they attempted to pour the material from the container into the jar to obtain a larger volume of material.  By the end of the day, START had collected 6 samples from various liquid vats, with a to date total of 1197 liquid sample obtained.  START also completed HAZCATing 202 liquid sample, bringing the total to date for those to 1041.  ERRS continued finalizing the bulking sequence for the vats.  To date the bulking sequence for the following categories has been completed: Acid, Acid Oxidizers, and Hexavalent Chrome Acids.  They will continue working on the bulking sequence for the remaining categories.  ERRS also continued with the staging of the 5-gal containers for bulking.  This will be an on-going process due to the number of 5-gal containers contained throughout the facility.

Saturday, May 31, 2003

EPA OSC (1), USCG PST (1), START (5), and ERRS (7) members on site.  START began to demobilize some of their equipment and personnel.  Continued HAZCAT operations and conducted a walkthrough to assess remaining sampling needs.  ERRS completed the following tasks: bulking sequence for the majority of the remaining vats (a few miscellaneous vats still have to be classified; remaining categories are Bases, Oxidizing Bases, and Cyanides), began work on the cyanide scrubber system that will be used during the pumping process, and continued staging orphan 5-gal containers for bulking.  The site was secured for the weekend.

Sunday, June 1, 2003
No work was performed.

Monday, June 2, 2003

EPA OSC (1), USCG PST (1), START (5), and ERRS (7) members on site.  The ERRS contractors completed filling the 3rd Baker tank with the consolidation of  thirty-two 55-gal drums.  They also consolidated and bulked like 5-gal containers into empty 55-gal drums.  ERRS bulked approximately 200 5-gal drums into their respective hazard waste class (i.e. acid, acid oxidizer, cyanide, etc.)  START staged, documented and sampled an 116 samples (1313 total to date.)

Tuesday, June 3, 2003

EPA OSC (1), USCG PST (1), START (6), and ERRS (7) members on site.  EPA CID servered a search warrant today at 1000.  (6)EPA CID members were on site conducting evidence gathering activities. ERRS continued bulking the 5-gal containers into their respective hazards classes.  They also conducted a walkthrough of the building gathering miscellaneous drums, containers, boxes, etc. that will need to be sampled.  They found approximately 60 additional items that needed sampling.  START members assisted the DEQ in the collection of 74 total samples from 45 different locations around the plating facility for the purpose of identifying additional waste and improper RCRA storage.  START teams also completed HAZCATing 116 samples that were sampled on June 2.


Next Steps

Where appropriate, ERRS will continue bulking hazardous waste by waste stream and remove via vacuum truck, baker tank, or drums, for proper disposal.  They will also work on the bulking sequence for the vats for the upcoming pumping operation.  Vacuum truck operations could proceed as early as Tuesday morning.  START will continue staging and HAZCATing unknown drums and containers as well as manage on site water accumulation.  As time allows, ERRS will continue removing contaminated debris, characterize sludges and liquids beneath vats in plating room as well as remove all sludges and liquids from floor and wastewater treatment unit.


Key Issues

Specific and General Requirements have been developed and discussed with the responsible party (owner) regarding the beneficial reuse of some chemicals that remain on site.  These Specific and General Requirements must be met by the owner before any  "products" could be removed from the site.  Failure by the responsible party to address or comply with any of the requirements my result in denial of transfer or custody of any or all of the requested materials.


Disposition of Wastes


Waste Stream Quantity Manifest # Disposal Facility
Sulfuric Acid, Hydrochloric Acid (Gallons)  4022gal, 2880gal 4100gals, 3750gal, 3742gal, 2500gal  89697, 89722, 89701, 90062, 90225, 90527  Burlington Environmental, Inc.
1700 E Alexander Ave
Tacoma, WA 98421
253-627-7568
EPA ID: WAD020257945 
Chromic Acid  3450gal  89954  Burlington Environmental, Inc
1701 E Alexander Ave
Tacoma, WA 98421
253-627-7568
EPA ID: WAD020257945 
Wastewater with Hexavalent Chrome  4000gal, 4945gal, 4776gal, 3900gal, 3589gal  89794, 89724, 89849, 90022, 89847  Burlington Environmental, Inc
1701 E Alexander Ave
Tacoma, WA 98421
253-627-7568
EPA ID: WAD020257945 
Wastewater with Lead and Zinc  3995 gal  0004  Burlington Environmental Inc.
1701 E Alexander Ave
Tacoma WA 98421
253-627-7568
EPA ID:
WA020257945 
Non-Cyanide Bulk Caustic Solution  2600gal, 4184gal, 4400gal, 4184 gal  90308, 90372, 90671, 91340  Burlington Environmental Inc.
1701 E Alexander Ave.
Tacoma, WA 98421
253-627-7568
EPA ID:
WA020257945 
Cyanide Bulk Caustic Solution  4500 gal, 3428gal  90301, 90370  Burlington Environmental Inc.
1701 E Alexander Ave.
Tacoma, WA 98421
253-627-7568
EPA ID:
WA020257945 
Non-RCRA Debris  2 40 yard bin  00003, 00012  Waste Management
55 International Way
Longview, WA 98632 
Non-Cyanide RCRA Debris  6- 20 yard bins  00001, 00002, 00009, 00010, 00005, 00013, 00014, 00018  U.S. Ecology
10.5 miles NW on HWY 78,Lemley Road
Grand View Idaho 83624 
Electroless Nickel  4012gal, 4376gal  89572, 89576  Burlington Environmental, Inc.
1701 E Alexander Ave
Tacoma, WA 98421
253-627-7568
EPA ID: WAD020257945
 


response.epa.gov/ColumbiaAmericaPlatingCo