United States Environmental Protection Agency
Region IX
POLLUTION REPORT



Date:
Thursday, September 7, 2006
From:
Craig Benson

To:
Francisco Arcaute, USEPA
Peter Guria, USEPA
Barbara Lee, USEPA
Celeste Temple, USEPA
Ivania Brown, USEPA
George Baker, DTSC
Andrew Helmlinger, USEPA
Craig Benson,
Steven John, USEPA
Sherry Fielding, USEPA
Region 9 RRC, USEPA
Rob Wise, USEPA
Chris Reiner, USEPA
Jason Musante, USEPA
Jim Hanson, USEPA
Dave Rasmussen, DTSC
Chad Gibson, START
Greg Holmes, DTSC
Trisha Woolslayer, START
Angeles Herrera, USEPA
Florence Gharibian, DTSC
Randi Jorgensen, DTSC
Caren Welch, AECOM
Treva Miller, DTSC
Ruth Williams-Morehead, DTSC

Subject: 

Continuation of Action
Atlas Metals
10019 S. Alameda St., Los Angeles, CA
Latitude: 33.9464000
Longitude: -118.2297000


POLREP No.:
4
Site #:
09NM
Reporting Period:
8/30 - 9/6
D.O. #:
Start Date:
8/3/2006
Response Authority:
CERCLA
Mob Date:
8/14/2006
Response Type:
Time-Critical
Demob Date:
 
NPL Status:
Non NPL
Completion Date:
 
Incident Category:
Removal Action
CERCLIS ID #:
CAN000908308
Contract #
RCRIS ID #:
 

Site Description

The Atlas Iron and Metal Co., Inc. site (Atlas) is located at 10019 South Alameda Street in the City of Los Angeles, California.  Atlas is bordered to the north by LEX-West, a Lexington Steel Corporation, to the south by David Starr Jordan High School facilities and to the west by the Jordan High School sports field.  Alameda Street and the Alameda corridor border Atlas facility to the east.  The Los Angeles River is located 3.5 miles southeast of Atlas.  Atlas is an approximately three acre active metal recycling facility where scrap metal is stored and prepared for reuse by cutting, welding and sorting operations.  The site has operated as a metal recycling facility since approximately 1949.  

In October, 2005 the California Department of Toxic Substances Control (DTSC), submitted a formal Request for Federal Action to EPA to address two waste piles present at the facility.  Subsequent negotiations between EPA, DTSC and the PRP resulted in an EPA-approved PRP Removal Action Workplan and Health and Safety Plan for the excavation and disposal of the waste piles and any associated areas of soil contamination.  The PRP removal team mobilized on August 14, 2006.  Field operations are expected to conclude at the end of August or early September 2006.

See POLREP #1 for additional site description.


Current Activities

All removal activities are being conducted by the PRP under the terms of an EPA-approved Removal Action Workplan (RAP) and Site Health and Safety Plan (HASP).  EPA approved the RAP on 8/3/06 and the HASP on 8/7/06.  The following organizations are participating in the removal action:

• EPA - Providing primary oversight of RAP implementation.
• DTSC - Providing oversight of RAP implementation and lead for community involvement coordination.
• SOS - Prime PRP contractor responsible for overall site removal activities.  In addition they are collecting perimeter air samples for lead contamination.
• ERRG - SOS subcontractor; responsible for sorting through waste piles to separate ferrous metals and waste, loading of wastes for off site disposal, and exclusion zone air monitoring for dust emissions.  


8/30/06
Personnel On-Site: OSC J. Musante, OSC C. Benson, 3-ERRG.

A. ERRG continued clean-up activities in the processed waste stockpile area.  Excavation to determine depth of the waste body in the large pile area is scheduled for 8/31.
  

8/31/06
Personnel On-Site: OSC Jason Musante, 1-START, DTSC B. Wu, 4-ERRG.

A. ERRG conducted “pothole” excavations at eight locations along two north-south transects in the large pile area.  Work in the exclusion zone was performed in modified level D.  Dust suppression was performed using water mist and other control measures identified in the RAP.  Excavation was conducted to approximately 5’ bgs at locations #1 - #7.  At these locations visible waste body materials transitioned to a uniform grey-brown soil layer at 1 - 2’ bgs.  ERRG collected soil samples from these locations for lead and PCBs analysis; split samples were provided to DTSC, by request.  At location #8 waste body materials were visible down to approximately 7’ bgs.  Excavation was stopped at this depth due to metallic debris impeding excavation; no sample was collected at this location.


9/01/06

A. ERRG continued clean-up activities at the site and secured the large pile area with plastic sheeting.


Planned Removal Actions

PRP-lead removal in progress.


Next Steps

• Excavation and removal of the waste body in the large pile area is scheduled to resume on 9/07/06.
• Confirmation sampling in the large pile area.


Key Issues

• EPA approval of SOS confirmation sampling strategy.
• EPA receipt of additional SOS air sampling data for review.


Estimated Costs *
  Budgeted Total To Date Remaining % Remaining
Extramural Costs
Intramural Costs
 
Total Site Costs $0.00 $0.00 $0.00 0.00%

* The above accounting of expenditures is an estimate based on figures known to the OSC at the time this report was written. The OSC does not necessarily receive specific figures on final payments made to any contractor(s). Other financial data which the OSC must rely upon may not be entirely up-to-date. The cost accounting provided in this report does not necessarily represent an exact monetary figure which the government may include in any claim for cost recovery.


response.epa.gov/atlas