United
States Environmental Protection Agency
Region IV
POLLUTION REPORT
|
| Date: |
Monday, February 5, 2007
|
| From: |
Perry Gaughan
|
| To: |
Shane Hitchcock, EPA ERRB
|
Jim McGuire, USEPA - Region IV
|
|
Subject:
|
Clean up Continues
Synthron Chemical Fire
305 Amherst Road,
Morganton, NC
Latitude: 35.7569000 Longitude: -81.6600000
|
| POLREP No.: |
12
|
Site #:
|
A4LD
|
| Reporting Period: |
|
D.O. #:
|
|
| Start Date: |
5/9/2006
|
Response Authority:
|
CERCLA
|
Mob Date: |
5/8/2006
|
Response Type:
|
Time-Critical
|
| Demob Date: |
|
NPL Status:
|
Non NPL
|
| Completion Date: |
|
Incident Category:
|
Removal Action
|
| CERCLIS ID #: |
NCD982121790
|
Contract #
|
|
| RCRIS ID #: |
|
|
|
For Site description and background information, refer to previous POLREP.
|
|
ERRs contractors remobed from the holidays on January 2nd to continue demolition and crushing operations. The asphalt access road to the tank farm area was removed, crushed and stockpiled to access two UST's. Previous information supplied to EPA suggested that closure plans had been submitted for all UST's on site, but EPA found two UST's; one containing #5 fuel oil and one containing a fuel oil/water mix. The fuel oil and oil/water waste was transported off site by STAT Environmental to IBS Environmental in Raleigh, North Carolina. The remaining tanks were cleaned and cut up for disposal.
The remaining 7000 pounds of paraformaldeyhde waste stored on site was transported to the Clean Harbors facility in Reedsville, SC for disposal. The eight small gas cylinders remaining on site were transported to IES Inc, Atlanta, Ga for gas analysis and disposal.
Upon review of residential samples taken upwind and downwind of the facility, START contractors assisted the OSC with analytical summaries and delivery of the letters. No contamination was discovered originating from the explosion or fire plume.
Site grading and hydroseeding activities were completed during the week of January 15th and the ERRs crew and USCG Gulf Strike Team demobed on January 25th.
|
|
No further removal activities on site.
|
| |
Budgeted |
Total To Date |
Remaining |
% Remaining |
|
Extramural Costs
|
| ERRS - Cleanup Contractor |
$1,650,000.00 |
$1,515,000.00 |
$135,000.00 |
8.18% |
| IAGs - Coast Guard |
$25,000.00 |
$20,000.00 |
$5,000.00 |
20.00% |
| RST/START |
$200,000.00 |
$184,000.00 |
$16,000.00 |
8.00% |
|
Intramural Costs
|
| |
| Total Site Costs |
$1,875,000.00 |
$1,719,000.00 |
$156,000.00 |
8.32% |
* The above accounting of expenditures is an estimate based on figures known to the OSC at the time this report was written. The OSC does not necessarily receive specific figures on final payments made to any contractor(s). Other financial data which the OSC must rely upon may not be entirely up-to-date. The cost accounting provided in this report does not necessarily represent an exact monetary figure which the government may include in any claim for cost recovery.
response.epa.gov/synthron
POLREP #12 Last Updated 3/29/2007
|