| Date: |
Thursday, October 9, 2003
|
| From: |
Benjamin Franco
|
|
Subject:
|
Initial and Final Pollution Report
Culp Petroleum Fire
1350 E. Main Street,
Rockhill, SC
|
| POLREP No.: |
1
|
Site #:
|
493
|
| Reporting Period: |
10/08-09/2003
|
D.O. #:
|
|
| Start Date: |
|
Response Authority:
|
OPA
|
Mob Date: |
10/8/2003
|
Response Type:
|
Emergency
|
| Demob Date: |
10/9/2003
|
NPL Status:
|
Non NPL
|
| Completion Date: |
|
Incident Category:
|
|
| CERCLIS ID #: |
|
Contract #
|
|
| RCRIS ID #: |
|
Reimbursable Account #
|
|
| FPN# |
|
|
|
The Culp Petrolueum Co. is a fuel distributor located in Rock Hill, SC. The companies handles diesel, gasoline and used oil. On 08OCT03, EPA phone duty officer received NRC report 701951 pertaining to a tank farm fire. The SCDHEC representative requested EPA assistance and an OSC was dispatched to investigate. Preliminary investigation from local police indicate that a man driving a pickup truck sufferred a medical problem ran through the Culp Petroleum Co. property's fence and into the facility's loading rack. The loading rack caught on fire. The driver was able not hurt, but was taken to an area hospital for observation. It is not beleived that the incident was done on purpose.
Five fire departments, including the Charlotte Airport, Fire Department repsonded to the fire. The Charlotte Fire Department brought a foam truck to put out the fire. A shopping center and several businesses in the area were evacuated. There is a propane distributor in close proximity to the burning facility, so the fire department had to use water to keep several fuel tanks cool.
Approximately 49,000 gallons of product was released. No runoff or fuel left the site. The responsible party dug a trench and a retention pond in order to collect any runoff from the fire and incoming rain.
|
|
The Culp Petroleum Co. hired an environmental contractor to recover product and water. The product/water mix is being sent to a disposal facilty in Charlotte, NC.
|
|
EPA will not conduct a removal action. SCDHEC will monitor the soil clean up.
|
| |
Budgeted |
Total To Date |
Remaining |
% Remaining |
|
Extramural Costs
|
|
Intramural Costs
|
| USEPA - Direct (Region, HQ) |
$150.00 |
$0.00 |
$150.00 |
100.00% |
| |
| Total Site Costs |
$150.00 |
$0.00 |
$150.00 |
100.00% |
* The above accounting of expenditures is an estimate based on figures known to the OSC at the time this report was written. The OSC does not necessarily receive specific figures on final payments made to any contractor(s). Other financial data which the OSC must rely upon may not be entirely up-to-date. The cost accounting provided in this report does not necessarily represent an exact monetary figure which the government may include in any claim for cost recovery.
response.epa.gov/CulpPetroleumFire