POLLUTION REPORT



Date:
Friday, July 13, 2007
From:
Paul L. Kahn & Eric M. Daly

To:
Mary Mears, USEPA, Region 2, PAD
Carole Petersen, USEPA, Region 2ERRD-NJRB
John Kushwara, USEPA Region 2 DECA-WCB
Patricia Carr, USEPA-PAD
Fred Mumford, NJDEP
Marissa Truono, USEPA ERRD-RAB
Walter Andrews , USEPA Region 2 DEPP-WPB
George Zachos, USEPA Region 2 ERRD
Andrew Radaant, US DOI
Dave Sweeney, NJDEP
Tim Grier, USEPA Headquarters 5202G
Kristin Grun, NJDEP
Joshua Gradwohl, NJDEP
Paul King, NJDEP
Carol Chamberlain, Lawrence Township Health Dept.

Subject: 

Friction Division Products
40 North Enterprise Ave, Lawrence Township (Trenton), NJ
Latitude: 40.2728000
Longitude: -74.7083000


POLREP No.:
33
Site #:
XW
Reporting Period:
D.O. #:
031
Start Date:
6/26/2006
Response Authority:
CERCLA
Mob Date:
1/28/2007
Response Type:
Time-Critical
Demob Date:
 
NPL Status:
Non NPL
Completion Date:
6/26/2007
Incident Category:
Removal Action
CERCLIS ID #:
NJN0002058677
Contract #
EP-W-04-055
RCRIS ID #:
 

Site Description

This Site, a defunct automotive brake pad manufacturer, was brought to the attention of EPA by the NJDEP for a possible referral for a CERCLA removal action.  An inspection by EPA OSCs and a DEP responder on 12/23/05 revealed the following hazardous materials/wastes were abandoned at the site: tons of asbestos material, tons of elemental sulphur, 1,000+ drums of mostly unknown materials or materials that do not match the label description, hundreds of smaller containers, acids, flammable liquids, iron and aluminum powders, flammable solids, waste oil, solvents, and other contaminants or pollutants.  The Site is semi-controlled, with most doors being locked but numerous open windows or sections of sheet-metal walls missing. A maintenance man is on-site for a few hours Mon-Fri.  

During June,2006, the OSC observed that employees of the RP, Friction Division Products, were entering the Site and loading contaminated drums and debris in a roll-off from Building #7. In the process of removing the contaminated debris they spilled powdered chemicals from broken bags on a pallet. EPA brought this to the attention of the property owners.  With EPA management authorization, and the owner's permission, EPA initiated security guard service as of June 15, 2006 to prevent access by the RP and other unauthorized persons.  Security guard service was discontinued on June 26, 2006, when RP agreed to not enter the Site unless EPA was present.


Current Activities

ERRS remobed to the Site on 7/9 from the holiday break.  ERRS completed decommissioning the 5th of 9 baghouses and bulked an additional 12 cubic yards of ACM removed from the baghouse.  ERRS moved the 6th baghouse (see POLREP cover photo), with approximately 1 ton of ACM inside, into the Q3 processing building for decommissioning.

H & S professional continues to monitor the crew for BP, pulse, and asbestos exposure.


Planned Removal Actions

Continue removing ACM from the remaining 3 baghouses then decon ACM from duct work removed from Building #7.


Next Steps

Schedule trucks to ship drummed wastes off Site for disposal.


Key Issues

Very hot temperatures hamper physical activity of personnel wearing modified Level "C" PPE, mandating more frequent breaks for the workers.