United States Environmental Protection Agency
Region IV
POLLUTION REPORT



Date:
Monday, September 10, 2007
From:
Leslie Sims


Subject: 

Initiation of Action
VCC Columbus
Columbus, GA
Latitude: 32.4575000
Longitude: -84.9690000


POLREP No.:
2
Site #:
A4LM
Reporting Period:
9/10 - 9/15/2007
D.O. #:
Start Date:
9/10/2007
Response Authority:
CERCLA
Mob Date:
9/10/2007
Response Type:
Time-Critical
Demob Date:
 
NPL Status:
Non NPL
Completion Date:
 
Incident Category:
Removal Action
CERCLIS ID #:
Contract #
RCRIS ID #:
 

Site Description

As part of the Region 4 Virginia-Carolina Chemical Company (VCC) Initiative with Exxon Mobil Corporation, an inventory of 40 former VCC facilities were identified which may have been contaminated with heavy metals from historic operations at a former phosphate fertilizer plant. The properties were targeted for future assessment and cleanup where warranted. The VCC Columbus Site(the Site) was one of the 40 areas targeted. The Site is located in Columbus, Muscogee County, Georgia within a mix use residential and commercial area. The Site is comprised of 22.5 acres, most of which have been redeveloped into approximately 32 parcels of mixed use residential and commercial properties.  The three largest parcels on the site are currently occupied by All American Recycling Company which recycles paper waste.  The remaining parcels are predominantly occupied with single and multi family residences.

The Site was screened and sampled to identify conditions which would trigger a removal action by the EPA in order to remove or minimize any potential threats to human health or the environment. There was no visible evidence of the former structures utilized to process the phosphate fertilizer product. The Removal Site Evaluation (RSE) included the review of historic documentation and the completion of a soil sampling event with XRF screening and confirmatory lab analysis. The RSE disclosed that there is significant surficial lead and arsenic contamination throughout the sampled areas of the residential properties. Small children and elderly persons reside at several of the homes where lead and arsenic were detected in the surface soils. Current Activities

On May 30, 2006, EPA's Emergency Response and Removal Branch (ERRB) sampled the Site to determine the full extent of contamination in the area. One industrial property, 6 residential properties, an elementary school playground, and a right away were sampled.  Analytical results from the sampling event revealed the presence of elevated levels of lead and arsenic in residential surface soils at the Site.  The arsenic and lead contamination was detected in the soils as high as 1,400 mg/kg and 13,000 mg/kg, respectively. Based on the high levels of lead and arsenic in surface soils and the potential threat posed by these contaminants to public health or the environment, the Site was recommended for a time-critical removal to remove the arsenic-and-lead-contaminated soils.


Current Activities

On September 10, 2007, EPA mobilized START and ERRS to begin removal activities. Activities completed during this reporting period included delineation of work and support zones, and mobilization and setup of all equipment and supplies. Residents located at the first two properties scheduled for removal action were temporarily relocated and will remain off site until removal activities at these locations are completed.


Planned Removal Actions

The hazardous conditions identified at the Site meet the National Oil and Hazardous Substances Pollution Contingency Plan (NCP) Section 300.415(b)(2) criteria for determining the appropriateness of a removal action. This action is initiated to address the actual or threatened release of hazardous substances from the Site, which may present an imminent and substantial endangerment to public health, welfare, or the environment.


Next Steps

The purpose of the time-critical removal action is to remove and dispose the lead and arsenic contaminated soils identified in the removal site evaluation. Excavation activities are scheduled to begin during the next reporting period and anticipated to be completed within 2-3 weeks.


Key Issues

GAEPD does not have the necessary resources to conduct a removal action at the Site.

Residents located in target removal areas will be relocated prior to the beginning of soils excavation at each specific location and will remain off site until removal activities are completed.


response.epa.gov/VCCColumbus