POLLUTION REPORT
|
| Date: |
Thursday, July 19, 2007
|
| From: |
Paul L. Kahn & Eric M. Daly
|
| To: |
Paul L. Kahn, USEPA
|
Eric Daly, USEPA
|
|
John Higgins, USEPA, Region 2, ERRD-RPB
|
Eric Mosher, USEPA , Region 2, ERRD-RPB
|
|
James Daloia, USEPA, Region 2, ERRD-RPB
|
Mary Mears, USEPA, Region 2, PAD
|
|
Delmar Karlen , USEPA Region 2 ORC-NJSFB
|
Carole Petersen, USEPA, Region 2ERRD-NJRB
|
|
John Kushwara, USEPA Region 2 DECA-WCB
|
Patricia Carr, USEPA-PAD
|
|
Fred Mumford, NJDEP
|
Marissa Truono, USEPA ERRD-RAB
|
|
Paul Zammit , USEPA Region 2 OIG
|
Walter Andrews , USEPA Region 2 DEPP-WPB
|
|
George Zachos, USEPA Region 2 ERRD
|
Andrew Radaant, US DOI
|
|
Dave Sweeney, NJDEP
|
Tim Grier, USEPA Headquarters 5202G
|
|
Deborah Schwenk, ORC
|
Kristin Grun, NJDEP
|
|
Joshua Gradwohl, NJDEP
|
Paul King, NJDEP
|
|
Carol Chamberlain, Lawrence Township Health Dept.
|
|
|
Subject:
|
Friction Division Products
40 North Enterprise Ave,
Lawrence Township (Trenton), NJ
Latitude: 40.2728000 Longitude: -74.7083000
|
| POLREP No.: |
34
|
Site #:
|
XW
|
| Reporting Period: |
|
D.O. #:
|
031
|
| Start Date: |
6/26/2006
|
Response Authority:
|
CERCLA
|
Mob Date: |
1/28/2007
|
Response Type:
|
Time-Critical
|
| Demob Date: |
|
NPL Status:
|
Non NPL
|
| Completion Date: |
|
Incident Category:
|
Removal Action
|
| CERCLIS ID #: |
NJN0002058677
|
Contract #
|
EP-W-04-055
|
| RCRIS ID #: |
|
|
|
This Site, a defunct automotive brake pad manufacturer, was brought to the attention of EPA by the NJDEP for a possible referral for a CERCLA removal action. An inspection by EPA OSCs and a DEP responder on 12/23/05 revealed the following hazardous materials/wastes were abandoned at the site: tons of asbestos material, tons of elemental sulphur, 1,000+ drums of mostly unknown materials or materials that do not match the label description, hundreds of smaller containers, acids, flammable liquids, iron and aluminum powders, flammable solids, waste oil, solvents, and other contaminants or pollutants. The Site is semi-controlled, with most doors being locked but numerous open windows or sections of sheet-metal walls missing. A maintenance man is on-site for a few hours Mon-Fri.
During June,2006, the OSC observed that employees of the RP, Friction Division Products, were entering the Site and loading contaminated drums and debris in a roll-off from Building #7. In the process of removing the contaminated debris they spilled powdered chemicals from broken bags on a pallet. EPA brought this to the attention of the property owners. With EPA management authorization, and the owner's permission, EPA initiated security guard service as of June 15, 2006 to prevent access by the RP and other unauthorized persons. Security guard service was discontinued on June 26, 2006, when RP agreed to not enter the Site unless EPA was present.
|
|
ERRS completed decommissioning the 6th of 9 baghouses, and bulked additional cubic yards of ACM from the baghouse. ERRS moved the 7th baghouse, with approximately 2 tons of ACM, into the Q3 processing building for decommissioning. To date, a total of 56 cubic yards of ACM, totaling more than 50 tons (see POLREP cover photo) has been bulked from the baghouses. H & S professional continues to monitor the crew for BP, pulse, signs of heat stress, and asbestos exposure.
OSC received compliance verification from EPA R-5 RCRA rep for the selected off-Site Ohio disposal facilities for the drummed wastes. Disposal of the wastes was postponed until the week of July 31st because of administrative delays at the Ohio DEP, which apparently has to pre-approve any wastes going to Heritage Environmental for incineration.
The escape of a prisoner from the jail located next to the Site caused a slight delay in work as the ERRS crew, as a group, searched the two buildings at the Site for the individual, whose whereabouts was unknown at the time.
|
|
ERRS will continue to process the remaining large baghouse and the two smaller devices.
ERRS will prepare labels and manifests for the drummed wastes for T & D.
Scrap metal, including the powerwashed baghouse duct work will continue to be bulked into roll offs for recycling.
|
|
As soon as all the baghouses are processed, ERRS will power-wash the duct work, bulk the ACM in piles in the alley between Bldgs. #7 & #8, and wash/vac the asbestos from the floor in Bldg. #8.
Other waste streams, including ACM and used PPE will be scheduled for T & D.
|
|
Heat stress concerns for the crew working in modified Level "C" PPE in high temperature/high humidity remains a major concern.
|
| |
Budgeted |
Total To Date |
Remaining |
% Remaining |
|
Extramural Costs
|
| ERRS - Cleanup Contractor |
$775,000.00 |
$757,000.00 |
$18,000.00 |
2.32% |
|
Intramural Costs
|
| |
| Total Site Costs |
$775,000.00 |
$757,000.00 |
$18,000.00 |
2.32% |
* The above accounting of expenditures is an estimate based on figures known to the OSC at the time this report was written. The OSC does not necessarily receive specific figures on final payments made to any contractor(s). Other financial data which the OSC must rely upon may not be entirely up-to-date. The cost accounting provided in this report does not necessarily represent an exact monetary figure which the government may include in any claim for cost recovery.
response.epa.gov/frictiondivision
POLREP #34 Last Updated 7/19/2007
|