Personnel On-Scene: 8/06/07 PADEP-1, START-1, Other-1, Security-1 (24 hr) 8/07/07 EPA-1, PADEP-2, Penn Line-2, Other-1 Security-1 (24 hr) 8/08/07 EPA-1, START-1, Security-1 (24 hr) 8/09/07 PADEP-2, START-1, Security-1 (24 hr) 8/10/07 PADEP-1, START-1, Security-1 (24 hr)
Weather: 8/06/07 Low of 68° F, high of 90° F. Hazy, 0.00 inches of precipitation, Wind Variable 5-9 mph. 8/07/07 Low of 63° F, high of 90° F. Clear, 0.00 inches of precipitation, Wind E 4-10 mph. 8/08/07 Low of 72° F, high of 91° F. Partly Cloudy, 0.00 inches of precipitation, Wind Variable 9-15 mph. 8/09/07 Low of 72° F, high of 80° F. Rain, 0.00 inches of precipitation, Wind N 4-7 mph. 8/10/07 Low of 70° F, high of 71° F. Overcast, 0.00 inches of precipitation, Wind N 2-3 mph.
8/06/07 PADEP Hoffman mobilized to site to assist in oversight. PADEP Hoffman and Start did a site walk through and security check. PADEP Hoffman demobilized.
START mobilized to site and assisted as needed, conducted written and photographic documentation, and monitored activities conducted on site. START demobilized.
8/07/07 EPA’s OSC Downie mobilized to site for oversight of site activities.
PADEP’s Morttini and Hoffman mobilized to site in assisted in oversight of all activities. PADEP Morettini and Hoffman demobilized.
Penn Line on site to check for foliage and branches around power lines.
Two persons identifying themselves as employees of Vector Management arrived on site and stated they were testing standing water for mosquito larvae. They had nothing to identify who they were or what they were doing so access to the site was denied. However PADEP Moerttini and Hoffman did retrieve for them a sample of standing water from the site.
8/08/07 OSC Downie on site to oversee site activities and entry to the site.
START mobilized to site and assisted as needed, conducted written and photographic documentation, and monitored activities conducted on site.
START mobilized to site and assisted as needed, conducted written and photographic documentation, and monitored activities conducted on site.
8/09/07 OSC Downie demobilized.
PADEP Morettini and Hoffman mobilized to site to assist in site overview and coordination of site activities. PADEP Morettini and Hoffman demobilized.
Pennsylvania American Water’s sub contractor was on site to replace water meter and reduce the size of intake pipe into the meter.
START assisted as needed, conducted written and photographic documentation, and monitored activities conducted on site.
8/10/07 START demobilized no activity planned on site for the day.
|