United
States Environmental Protection Agency
Region V
POLLUTION REPORT
|
| Date: |
Monday, August 20, 2007
|
| From: |
Sonia R. Vega
|
| To: |
Sonia R. Vega, USEPA
|
Mary Gade, U.S. EPA
|
|
Bharat Mathur, U.S. EPA
|
Rick Karl, U.S. EPA
|
|
Linda Nachowicz, U.S. EPA
|
Ralph Dollhopf, U.S. EPA
|
|
Charles Gebien, U.S. EPA
|
David Chung, U.S. EPA
|
|
John Maritote, U.S. EPA
|
Steve Lee, MPCA
|
|
Mark Johnson, ATSDR
|
Dorene Fier-Tucker, MPCA
|
|
Fred Micke, U.S. EPA
|
lori olson, City of Minneapolis
|
|
Subject:
|
U.S. EPA Awaits Begining of Bridge Deconstruction to Conduct Additional Air Monitoring
I-35W Mississipi River Bridge Collapse
Minneapolis, MN
Latitude: 44.9789000 Longitude: -93.2450000
|
| POLREP No.: |
5
|
Site #:
|
B5KZ
|
| Reporting Period: |
August 12 to August 20, 2007
|
D.O. #:
|
|
| Start Date: |
8/1/2007
|
Response Authority:
|
CERCLA
|
Mob Date: |
8/3/2007
|
Response Type:
|
Emergency
|
| Demob Date: |
|
NPL Status:
|
Non NPL
|
| Completion Date: |
|
Incident Category:
|
Removal Assessment
|
| CERCLIS ID #: |
|
Contract #
|
|
| RCRIS ID #: |
|
|
|
The U.S. EPA completed the round of baseline sampling on Sunday, August 12, 2007. All the data was sent to the State agencies. There is no evidence of hazardous materials releases at this time.
|
|
Today, we were told that demolition might begin on Wednesday or Thursday, but that is subject to change due to weather and recovery operations. We will be notified when the bridge deconstruction begins. At that time, we will conduct additional air sampling. There will be 5 consecutive days of sampling at the same 7 locations previously established. The purpose of this additional sampling is to determine if the demolition activities have an impact on air quality in the nearby residential neighborhoods.
We will be analyzing for the same parameters: asbestos, metals, particulates and silica.
|
|
Conduct the 5 consecutive days of sampling, and submit the data to the State for evaluation.
|
|
Weather - Heavy rain in MN in the last few days is delaying the work on site. There is more rain in the forecast. We are ready to commence the sampling as soon as the demolition begins.
|
| |
Budgeted |
Total To Date |
Remaining |
% Remaining |
|
Extramural Costs
|
|
Intramural Costs
|
| |
| Total Site Costs |
$0.00 |
$0.00 |
$0.00 |
0.00% |
* The above accounting of expenditures is an estimate based on figures known to the OSC at the time this report was written. The OSC does not necessarily receive specific figures on final payments made to any contractor(s). Other financial data which the OSC must rely upon may not be entirely up-to-date. The cost accounting provided in this report does not necessarily represent an exact monetary figure which the government may include in any claim for cost recovery.
response.epa.gov/I35WMississippiRiverBridgeCollapse
POLREP #5 Last Updated 8/20/2007
|