Personnel On-Scene: 9/04/07 EPA-1,PADEP-1, START-1, NIAPRO-4, URS-1, MHF-1, New Castle Lock & Key-1, Other-2, Security-1 (24 hr) 9.05/07 PADEP-2, START-1, NIAPRO-4, Other-1, Security-1 (24 hr) 9/06/07 EPA-2, PADEP-1, START-1, NIAPRO-4, Other-1, Security-1 (24 hr) 9/07/07 EPA-1, START-1, MHF-4, Other-1, Security-1 (24 hr)
Weather: 9/04/07 Low of 65° F, high of 86° F. Clear, 0.00 inches of precipitation, Wind Variable 3-6 mph. 9/05/07 Low of 62° F, high of 88° F. Clear, 0.00 inches of precipitation, Wind Calm 3-5 mph. 9/06/07 Low of 61° F, high of 94° F. Clear, 0.00 inches of precipitation, Wind Variable 3-4 mph. 9/07/07 Low of 70° F, high of 89° F. Clear to Mostly Cloudy, 0.00 inches of precipitation, Wind SSW 4-14 mph.
9/04/07 NIAPRO a subcontractor for Winters Performance Products, Inc began to repackage Winters drums into super sacks. The super sacks hold 8 drums per pallet. NIAPRO repackaged 12 pallets of material @ 8 drums a pallet..
EPA’s Rich Messimer Senior Site Administrative Officer mobilized to site for site administration. EPA’s Messimer demobilized
PADEP Hoffman mobilized to site to assist in oversight. PADEP Hoffman and Start did a site walk through /securities check and observed NIAPRO repackaging Winters Performance Product Inc.’s material. PADEP Hoffman demobilized.
START mobilized to site and assisted as needed, conducted written and photographic documentation, and monitored activities conducted on site.
9/05/07 NIAPRO a subcontractor for Winters Performance Products, Inc continued to repackage Winters drums into super sacks. NIAPRO repackaged 24 pallets @ 8 drums a pallet.
American Iron & Metals contractor MHF Logistical Solutions loaded 1 truckload of material. The estimated weight of the load was 35,000 pounds and consisted of 21 super sacks @ 3 drums a piece and 3 super sacks @ 4 drums a piece. The load was consigned to Magpro, Camden, TN and transported by Landstar Trucking, Jacksonville, FL.
PADEP Morettini and Hoffman mobilized to site and assisted in oversight of all activities. PADEP Morettini and Hoffman demobilized.
START assisted as needed, conducted written and photographic documentation, and monitored activities conducted on site.
9/06/07 NIAPRO a subcontractor for Winters Performance Products, Inc continued to repackage Winters drums into super sacks. NIAPRO repackaged 18pallets @ 8 drums a pallet.
OSC Marjorie Easton mobilized to site for oversight of activities and control of entry to the site.
EPA’s Rich Messimer Senior Site Administrative Officer mobilized to site for site administration. EPA’s Messimer demobilized.
START assisted as needed, conducted written and photographic documentation, and monitored activities conducted on site.
9/07/07 NIAPRO a subcontractor for Winters Performance Products, Inc finished repacking Winters drums into super sacks. NIAPRO repackaged 8pallets @ 8 drums a pallet.
American Iron & Metals subcontractor MHF Logistical Solutions began to stage pallets for pick up on 9/10/07. The pallets consisted of 3 and 4 drums in a super sack per pallet. Because the super sacks were left on site after repackaging they had to be checked for water. When a super sack contained water it was visually checked for oil and if there was no visible oil sheen then it was checked for PH balance. Once it was determined that the rain water contained no oil and the PH balance was neutral than the water could be drained on site. No super sacks were found to contain oil or a high or low PH balance and each super sack was individually opened, visually checked and tested for PH. START witnessed the testing of all super sacks. MHF staged 29 pallets with 14 of the 29 haven to be drained of rain water.
OSC Marjorie Easton maintained a presence on site for oversight of activities and control of entry to the site. OSC Easton demobilized.
START assisted as needed, conducted written and photographic documentation, and monitored activities conducted on site. START demobilized
|