POLLUTION REPORT
|
| Date: |
Monday, November 26, 2007
|
| From: |
Don Mclaughlin
|
|
Subject:
|
Notice Letter due date amendment
Kessel Lumber Supply
US Highway 50 & US Highway 220,
Keyser, WV
Latitude: 39.3916670 Longitude: -79.0083330
|
| POLREP No.: |
5
|
Site #:
|
WVD016087322
|
| Reporting Period: |
|
D.O. #:
|
|
| Start Date: |
|
Response Authority:
|
CERCLA
|
Mob Date: |
|
Response Type:
|
|
| Demob Date: |
|
NPL Status:
|
Non NPL
|
| Completion Date: |
|
Incident Category:
|
|
| CERCLIS ID #: |
|
Contract #
|
|
| RCRIS ID #: |
|
|
|
The facility was known to use chromated copper arsenate (CCA) to treat fence rails and mine lumber. RCRA had notified the facility regarding the proper disposal of CCA tanks located on-site, but residual product remains on-site with the potential to affect groundwater in the surrounding community.
|
|
EPA conducted surface and subsurface soil, sediment, and surface water sampling at the facility to determine the need for a potential removal action. Sampling results indicate Arsenic contamination across the site in surface soils and sediment, down to 6'. OSC met with RP to discuss sampling findings, and to secure the site from trespassers. RP has indicated an interest in hiring a clean up contractor to address the contamination at the site. RP has secured the site as per OSC recommendations.
|
|
Notice Letters have been distributed to the RP. Also, the letters include the extent of removal activities that EPA is anticipating at the site.
|
|
RP has requested additional tiemframe to reply to notice letters due to family issues. OSC and ORC have spoken with RPs attorney, and have agreed to extend the deadline for reply from the RP.
|
|
Site continues to remain secure from potential trespassers
|
| |
Budgeted |
Total To Date |
Remaining |
% Remaining |
|
Extramural Costs
|
|
Intramural Costs
|
| |
| Total Site Costs |
$0.00 |
$0.00 |
$0.00 |
0.00% |
* The above accounting of expenditures is an estimate based on figures known to the OSC at the time this report was written. The OSC does not necessarily receive specific figures on final payments made to any contractor(s). Other financial data which the OSC must rely upon may not be entirely up-to-date. The cost accounting provided in this report does not necessarily represent an exact monetary figure which the government may include in any claim for cost recovery.