October 1 through 4, 2003: ERRS subcontractor (1) ERRS subcontractor conducted operations and maintenance activities, including installing a new probe and reel in MW-9 on 10/03/2003. A total of 37 gallons of material recovered in the 1,000 gallon tank. October 5 through 11, 2003: ERRS Subcontractor (1) ERRS Subcontractor conducted operations and maintenance activities, including cleaning the fuel extraction pumps. A total of 40.5 gallons of material recovered in the 1,000 gallon tank.
October 12 through 18, 2003: ERRS Subcontractor (1) ERRS Subcontractor conducted operations and maintenance activities. A total of 44.5 gallons of material recovered in the 1,000 gallon tank. October 19 through 25, 2003: ERRS Subcontractor (1) ERRS Subcontractor conducted operations and maintenance activities. A total of 48 gallons of material recovered in the 1,000 gallon tank.
October 26 through 31, 2003: ERRS Subcontractor (1) ERRS Subcontractor conducted operations and maintenance activities. A total of 51.5 gallons of material recovered in the 1,000 gallon tank.
|