Personnel On-Scene: 01/08/08 EPA-1, PADEP-1, START-1, ERRS-8, MHF-1, Other-2, Security-1 (24 hr) 01/09/08 EPA-1, PADEP-1, START-1, ERRS-8, Security-1 (24 hr) 01/10/08 EPA-1, START-1, ERRS-8, Other-2, Security-1 (24 hr) 01/11/08 PADEP-1, START-1, ERRS-8, Other-3, Security-1 (24 hr) Weather: 01/08/08 Low of 56° F, high of 67° F. Clear, 0.00 inches of precipitation, wind S 10 mph. 01/09/08 Low of 41° F, high of 46° F. Overcast, 0.00 inches of precipitation, wind W 8-17 mph. 01/10/08 Low of 25° F, high of 46° F. Clear, 0.00 inches of precipitation, wind E 3-13 mph. 01/11/08 Low of 37° F, high of 46° F. Overcast, 0.00 inches of precipitation, wind SW 7-24 mph.
01/08/08 MHF Logistical Solutions had 1 person on site to ship its remaining empty over packs off site and also 2 fork trucks. MHF has suspended shipping for Intermet do to logistical problems.
EPA’s Senior Site Administrative Officer Rich Messimer mobilized to site to oversee site logistics and administration. EPA’s Rich Messimer demobilized.
PADEP Mariruth Hoffman mobilized to site to assist in oversight of operations. PADEP Hoffman also started the High Volume Samplers. PADEP Hoffman demobilized.
A morning safety meeting was held by EPA, ERRS contractor Guardian Environmental Services, Inc. ERRS continues to react material removed from burn pile located on Slab #3. ERRS is also sifting material removed from the burn pile in order to remove large debris. START mobilized to site to assist the EPA as needed, conduct written/photographic documentation, and monitor activities conducted on site.
01/09/08 EPA’s Senior Site Administrative Officer Rich Messimer mobilized to site to oversee site logistics and administration. EPA’s Rich Messimer demobilized.
PADEP Mariruth Hoffman mobilized to site to assist in oversight of operations. PADEP Hoffman demobilized.
START attended morning safety meeting held by EPA, ERRS contractor Guardian Environmental Services, Inc. ERRS is continued sifting and reacting material removed from the burn pile.
START continues to assist the EPA as needed, conduct written/photographic documentation, and monitor activities conducted on site.
01/10/08 EPA’s Senior Site Administrative Officer Rich Messimer mobilized to site to oversee site logistics and administration. EPA’s Rich Messimer demobilized.
START attended morning safety meeting held by EPA, ERRS contractor Guardian Environmental Services, Inc. ERRS is reacting and sifting material removed from the burn pile previously located on Slab #3. ERRS is also preparing to move RAD drums to the back of Building #7 for staging to ship off site.
START continues to assist the EPA as needed, conduct written/photographic documentation, and monitor activities conducted on site.
01/11/08 PADEP Mariruth Hoffman mobilized to site to assist in oversight of operations. PADEP Hoffman demobilized.
START attended morning safety meeting held by EPA, ERRS contractor Guardian Environmental Services, Inc. ERRS continues to sift and react material from the burn pile.
Pennsylvania American Water Company was on site to find the leak in their system that is on site. PAWC reports losing 60,000 gallons of water per day inside Gate 2 in the grassy area near the propane tank. This area continues to have standing water.
START continues to assist the EPA as needed, conduct written/photographic documentation, and monitor activities conducted on site.
|