United States Environmental Protection Agency
Region IX
POLLUTION REPORT



Date:
Sunday, February 10, 2008
From:
Robert Wise

Subject: 

Continuation of cleanup
Greka Bell Lease 3
6801 Palmer Road, Santa Maria, CA
Latitude: 34.8279500
Longitude: -120.3254400


POLREP No.:
3
Site #:
Reporting Period:
D.O. #:
Start Date:
 
Response Authority:
OPA
Mob Date:
1/29/2008
Response Type:
Emergency
Demob Date:
 
NPL Status:
Non NPL
Completion Date:
 
Incident Category:
Removal Action
CERCLIS ID #:
Contract #
RCRIS ID #:
Reimbursable Account #
FPN#
E08906
 

Site Description

See Polrep #1


Current Activities

Greka is continuing to conduct cleanup operations in the creek.  The recent rains brought much of the oil to the surface.  After consultation with the California Dept. of Fish and Game (DFG)Warden on-site, it was OSC Wise directed Greka to assist their contractor with the mechanical excavation of the creek.  Greka is to provide a backhoe and operator only.  No Greka personnel are to work in the creek.  Mechanical excavation was used to the deep impaction of the oil into the floor and walls of the creek presumably to heavy water flow from the recent rains.  Mechanical excavation will be limited to the areas identified on Feb. 9 and be conducted under the supervision of the Pacific Strike Team and DFG.


Planned Removal Actions

1.  A walk of the creek is planned for Monday, Feb. 11, 2008 to identify any additional areas requiring oil removal.
2.  Greka must remove all the oiled sediment from the waste water pond from which the still originated to prevent future spills.
3.  Greka must submit a sampling plan to EPA and the Santa Barbara Co. Fire Department for approval prior to cleanup confirmation sampling.