November 1 through 8, 2003: ERRS subcontractor (1) ERRS subcontractor conducted operations and maintenance activities. A total of 64 gallons of material recovered in the 1,000 gallon tank. November 9 through 15, 2003: ERRS Subcontractor (1) ERRS Subcontractor conducted operations and maintenance activities, including cleaning the fuel extraction pumps. A total of 68 gallons of material recovered in the 1,000 gallon tank.
November 16 through 25, 2003: ERRS Subcontractor (1) ERRS Subcontractor conducted operations and maintenance activities. A total of 79 gallons of material recovered in the 1,000 gallon tank.
|