Personnel On-Scene: 02/28/08 EPA-1, START-2, ERRS-7, Other-3, Security-1 (24 hr) 02/29/08 EPA-1, START-2, ERRS-7, Other-3, Security-1 (24 hr) Weather: 02/28/08 Low of 5° F, high of 19° F. Overcast, 0.00inches of precipitation, wind NW 4-9 mph. 02/29/08 Low of 18° F, high of 33° F. Light Snow, 0.01 inches of precipitation, SSE 6-10 mph.
02/28/08 U.S.EPA’s OSC Jack Downie was on site for oversight of activities and site entry.
Emergency and Rapid Response Services (ERRS) contractor Guardian Environmental, Inc held its morning safety meeting and discussed the days planned activities, areas of concern and safety issues associated with the day’s activities. ERRS continues to react material from Building 2 in the reaction pit and accelerates the reaction by adding water. ERRS reacted 55 drums for the day. ERRS has reacted 868 drums to date. ERRS is taking extra precautions when working the material.
Nelson Tree Service and First Energy had personnel on site to check for trees and limbs that may fall onto power lines and to check for hot spots in the high voltage electrical transmission lines.
START assisted as needed and conducted written/photographic documentation.
02/29/08 U.S.EPA’s OSC Jack Downie was on site for oversight of activities and site entry. OSC Downie demobilized.
Emergency and Rapid Response Services ERRS contractor Guardian Environmental, Inc held its morning safety meeting and discussed the days planned activities, areas of concern and safety issues associated with the day’s activities. ERRS continued to react material from Building 2 in the reaction pit to date ERRS has reacted 940 drums, 72 for this day. The material continues to give off heat and gases.
First Energy had 3 personnel on site tracing power lines that need work in the spring.
START assisted as needed and conducted written/photographic documentation.
|