Personnel On-Scene: 03/04/08 EPA-2, START-2, ERRS-8, Security-1 (24 hr) 03/05/08 EPA-1, START-2, ERRS-8, Other-2, Security-1 (24 hr) 03/06/08 EPA-3, START-2, ERRS-8, Other-1, Security-1 (24 hr) 03/07/08 EPA-2, START-2, Security-1 (24 hr) Weather: 03/04/08 Low of 34° F, high of 37° F. Light Rain, 0.00inches of precipitation, wind NNE 3-9 mph. 03/05/08 Low of 28° F, high of 30° F. Overcast, 0.00 inches of precipitation, W 8-20 mph. 03/06/08 Low of 30° F, high of 44° F. Mostly Cloudy, 0.00 inches of precipitation, SW 6-11 mph. 03/07/08 Low of 30° F, high of 32° F. Light Snow, 0.00 inches of precipitation, NNE 9-16 mph.
03/04/08 OSC Jack Downie was on site for oversight of activities and site entry.
Magnesium Electron was on site to meet with the OSC and try and identify material that may be theirs.
Emergency and Rapid Response Services (ERRS) contractor Guardian Environmental, Inc held its morning safety meeting and discussed the days planned activities, areas of concern and safety issues associated with the day’s activities. ERRS continues to react drums from Building #8. ERRS is also reacting various nondrums that have been found on site. These drums do not contain elemental magnesium fines. ERRS is taking extra precautions when working the material.
START assisted as needed and conducted written/photographic documentation.
03/05/08 OSC Jack Downie was on site for oversight of activities and site entry.
Trimag SE.C. had 1 person on site to identify material and meet with OSC Downie.
Emergency and Rapid Response Services (ERRS) contractor Guardian Environmental, Inc held its morning safety meeting and discussed the days planned activities, areas of concern and safety issues associated with the day’s activities. ERRS continues to react material from Building 8 and unknown reactive materials found around the site. Some material continues to react violently and ERRS is modify its operations according to the reactions.
START assisted the EPA as needed and conducted written/photographic documentation.
03/06/08 OSC Jack Downie was on site for oversight of activities and site entry.
Timminco had 1 personnel on site to identify material and meet with the OSC. OSC Downie and START escorted the personnel on site.
Emergency and Rapid Response Services (ERRS) contractor Guardian Environmental, Inc held its morning safety meeting and discussed the days planned activities, areas of concern and safety issues associated with the day’s activities. ERRS continued to react material in the reaction pit.
START assisted the EPA as needed and conducted written/photographic documentation.
03/07/08 START was on site to collect waypoints using the Trimble unit. START demobilized
|