POLLUTION REPORT
|
| Date: |
Wednesday, March 12, 2008
|
| From: |
Will Duncan
|
|
Subject:
|
Final POLREP
Blue Ledge Mine Site
Joe Bar, CA
Latitude: 41.9600000 Longitude: -123.1308000
|
| POLREP No.: |
3
|
Site #:
|
09MM
|
| Reporting Period: |
09/18/2006 thru 09/19/2008
|
D.O. #:
|
02-016-9065
|
| Start Date: |
8/28/2006
|
Response Authority:
|
CERCLA
|
Mob Date: |
8/28/2006
|
Response Type:
|
Time-Critical
|
| Demob Date: |
9/20/2006
|
NPL Status:
|
Non NPL
|
| Completion Date: |
9/19/2006
|
Incident Category:
|
Removal Action
|
| CERCLIS ID #: |
CAN000906063
|
Contract #
|
68-W-02-016
|
| RCRIS ID #: |
|
|
|
The Blue Ledge Mine site (Site) is an abandoned copper mine situated on patented private land within the Rogue River National Forest on United States Forest Service (USFS) Road 1060.
For More Site description information, refer to Pollution Report #1.
|
|
September 16 - 17, 2006
No on-site work performed on the weekend.
September 18, 2006
Personnel: 1 OSC, 1 START, 7 ERRS Weather: Cool, Clear Skies, Sunny, mid 50’s to high 60’s.
The ERRS contractor continued to place and key in limestone boulders in sloped channel. ERRS cut and placed tree branches on the exposed slope west of the channel to minimize winter erosion effects. OSC Chris Weden arrived today and was given a site tour.
September 19, 2006
Personnel: 1 OSC, 1 START, 8 ERRS Weather: Cool morning, overcast, low 50’s breaking to sunny clear skies high 60’s.
The ERRS contractor finished final placement of limestone boulders in the channel connecting to the sediment pond. ERRS “slashed” the lower road with tree branches and wood debris. Additionally they removed the soil and trees in the run-off channel at the upper road. They placed and secured limestone boulders in the channel and built a reinforcement berm down slope. All equipment was brought down and decontaminated. OSC Chris Weden to meet with USFS rep. Pete Jones tomorrow.
July 02, 2007 Personnel: 3 OSC, 1 USFS Weather: Sunny Clear skies
|
|
Current removal activities at the site have been completed. The stabilazation and passive treatment efforts outlined in the action memo have been accomplished. Weather conditions will soon make access to the site impossible. No further ERS sponsored removal activities are currently planned for the site.
|
| |
Budgeted |
Total To Date |
Remaining |
% Remaining |
|
Extramural Costs
|
| ERRS - Cleanup Contractor |
$425,000.00 |
$281,395.20 |
$143,604.80 |
33.79% |
| RST/START |
$65,000.00 |
$24,160.79 |
$40,839.21 |
62.83% |
|
Intramural Costs
|
| USEPA - Direct (Region, HQ) |
$40,000.00 |
$0.00 |
$40,000.00 |
100.00% |
| USEPA - InDirect |
$126,302.00 |
$0.00 |
$126,302.00 |
100.00% |
| |
| Total Site Costs |
$656,302.00 |
$305,555.99 |
$350,746.01 |
53.44% |
* The above accounting of expenditures is an estimate based on figures known to the OSC at the time this report was written. The OSC does not necessarily receive specific figures on final payments made to any contractor(s). Other financial data which the OSC must rely upon may not be entirely up-to-date. The cost accounting provided in this report does not necessarily represent an exact monetary figure which the government may include in any claim for cost recovery.
response.epa.gov/BlueLedgeMine
POLREP #3 Last Updated 8/5/2009
|