Personnel On-Scene: 04/10/08 START-1, ERRS-7, Other-1, Security-1 (24 hr) 04/14/08 USEPA-2, PADEP-1, START-2, National Machine-8, Other-1, Security-1 (24 hr) Weather: 04/10/08 Low of 32° F, high of 64° F. Clear, 0.00inches of precipitation, wind ENE 2-10 mph. 04/14/08 Low of 29° F, high of 47° F. Scattered Clouds, 0.00 inches of precipitation, Variable 5-15 mph.
04/10/08 Emergency and Rapid Response Services (ERRS) contractor Guardian Environmental, Inc held its morning safety meeting and discussed the days planned activities, areas of concern / safety issues associated with the day’s activities. ERRS completed reacting material from Building #9 marked as residual waste and cleared the reaction pit. ERRS is sifting and moving debris to make a area where trucks can be loaded when the off loading of the 250-ton piles begins.
START assisted as needed and conducted written/photographic documentation.
04/14/08 U.S.EPA OSC Marjorie Easton mobilized to site for oversight of activities. OSC Easton demobilized.
U.S. EPA Senior Site Administrative Officer of the Removal Program Rich Messimer mobilized to site for administrative oversight. EPA’s Rich Messimer demobilized.
PADEP Mariruth Hoffman mobilized to site to assist the EPA in oversight. PADEP Hoffman demobilized.
National Machine and its contractor were on site to identify and repackage their material for removal
Emergency and Rapid Response Services (ERRS) contractor Guardian Environmental, Inc was not on site, it was their mobilization day. START assisted the EPA as needed and conducted written/photographic documentation.
|