Personnel On-Scene: 05/22/08 EPA-1, START-2, MHF-3, ERRS-7, Security-1 (24 hr) 05/23/08 START-1, MHF-2, Security-1 (24 hr) Weather: 05/22/08 Low of 44° F, high of 53° F. Overcast, 0.00inches of precipitation, wind NNW 5-13 mph. 05/23/08 Low of 35° F, high of 60° F. Scattered Clouds, 0.01inches of precipitation, Variable 5-9 mph.
05/22/08 START attended the morning safety meeting held by MHF Logistics who is contracting for Intermet, SPX Contech, and Product Technology. MHF is changing lids and pallets on SPX Contech material MHF over packed material that was not DOT shippable into shippable containers. MHF loaded 1 truckload of material. This material was than unloaded because the receiving facility refused to except the shipment of Intermet material.
EPA’s Senior Site Administrative Officer of The Removal Program Rich Messimer mobilized to site and did administrative oversight. Rich Messimer demobilized.
Emergency and Rapid Response Services (ERRS) contractor Guardian Environmental, Inc held its morning safety meeting and discussed the days planned activities, areas of concern / safety issues associated with the day’s activities. ERRS removed material from the reaction pit and did maintenance on their equipment and prepared the site for the Holiday weekend.
START assisted as needed and conducted written/photographic documentation.
05/23/08 START attended the morning safety meeting held by MHF who is contracting for Intermet, SPX Contech, and Product Technology. MHF changed lids and pallets on material belonging to SPX Contech. MHF was notified from the receiving facility to suspend shipping operations until it was determined how much material they could handle.
Emergency and Rapid Response Services (ERRS) contractor Guardian Environmental, Inc demobilized. START assisted the EPA as needed and conducted written/photographic documentation. START demobilized.
|