United
States Environmental Protection Agency
Region IX
POLLUTION REPORT
|
| Date: |
Thursday, June 26, 2008
|
| From: |
Robert Wise
|
| To: |
ERT Support,
|
Steve Calanog, EPA
|
|
Paul Casa Grande, EPA
|
Eugene Rainwater, EPA
|
|
Barbara Lee, EPA
|
Ivania Brown, EPA
|
|
Peggy De La Torre, EPA
|
Pat Port, DOI
|
|
Sherry Fielding, EPA
|
Carole Kirby, Cinncinatti Finance, USEPA
|
|
Harvey Packard, RWQCB
|
Harry Allan, ERS
|
|
Hedy Salter, USEPA R9
|
Craig Benson, ERS
|
|
Daniel Meer, US EPA R9
|
Peter Guria, ERS
|
|
Lt. Brian Gollhopher, CADFG
|
Mark Samolis, USEPA
|
|
Mary Simms, EPA
|
Steven John, EPA
|
|
Jason Musante, ERS
|
Kenneth Wilson, DFG
|
|
Melissa Boggs-Blalack, DFG
|
Jim Hanson, EPA
|
|
Josha Curtis, CADFG-OSPR
|
Donn Zuroski, ERS
|
|
John Holland, DFG
|
Damian Higgins, USFWS
|
|
Rich Martyn, EPA
|
Will Duncan, ERS
|
|
Janet Yocum, ERS
|
Michelle Rogow, ERS
|
|
Martin Powell, ERS
|
Tom Dunkelman, ERS
|
|
Peter Reich, EPA
|
Greg Haas, Congression Staffer
|
|
Josh Neipp, SBCOFD
|
Richard Todd, SBCoFD
|
|
Kate Sulka, SBCFD
|
Michael Massey, EPA ORC
|
|
Mike Connell, CADFG OSPR
|
Steve Nailor, SBCOFD
|
|
Todd Stanley, CCRWQCB
|
Terry Snyder, APCD
|
|
Pam McNulty, SBCO Petroleum Office
|
Mike Zimmer, SBCO Petroleum Office
|
|
Denise Steurer, USFWS
|
Ian Zelo, NOAA
|
|
Steffanie Wood, EPA
|
|
|
Subject:
|
Cleaning of Tanks
Greka Energy Zaca Lease Davis Tank Battery 2008 Spill
5017 Zaca Station Road,
Los Olivos, CA
Latitude: 34.7265878 Longitude: -120.1471478
|
| POLREP No.: |
15
|
Site #:
|
|
| Reporting Period: |
|
D.O. #:
|
|
| Start Date: |
1/5/2008
|
Response Authority:
|
OPA
|
Mob Date: |
1/6/2008
|
Response Type:
|
Emergency
|
| Demob Date: |
|
NPL Status:
|
Non NPL
|
| Completion Date: |
|
Incident Category:
|
Removal Action
|
| CERCLIS ID #: |
|
Contract #
|
|
| RCRIS ID #: |
|
Reimbursable Account #
|
|
| FPN# |
E08903
|
|
|
See POLREP #1
On June 23, 2008, the Santa Barbara County Fire Department lifted the stop work order on the Zaca Lease allowing Greka to resume operations.
|
|
OSC Wise dispatched two U.S. Coast Pacific Strike Team (PST) members to conduct oversight of the restart of the Zaca Lease. This was done becaused in 2006 after the cleanup of the December 2005 spill, Greka had a number of small spills when they were brining the lease back up on-line. PST will be on-site until early July 2008.
|
|
1. Cleaning and removal of the last tank. 2. Restoration of the Firestone Winery Property 3. Submittal of the final report
|
|
On June 6, 2008, Greka's contractor, American Integrated Services notified OSC Wise via e-mail that the temporary storage tanks at the site were all cleaned. On June 10, 2008, Greka notified OSC Wise via e-mail that they were arranging for the removal of the cleaned tanks. On June 25, 2008, OSC Wise and START were on-site at Zaca and observed a single temporary storage tank from the cleanup on-site. When the inside of the tank was examined, it was discovered that the tank contained at least 1' of oil sludge. This contradicts the two e-mails previously recieved by OSC Wise.
OSC Wise directed Greka to have that tank cleaned and removed no later then June 27, 2008. In addition, OSC Wise directed Greka to remove the plastic and debris from the two tank storage areas on the Firestone Winery property and grade the area smooth, also by June 27.
|
| |
Budgeted |
Total To Date |
Remaining |
% Remaining |
|
Extramural Costs
|
| PST |
$50,000.00 |
$40,000.00 |
$10,000.00 |
20.00% |
| RST/START |
$83,388.00 |
$73,840.00 |
$9,548.00 |
11.45% |
|
Intramural Costs
|
| USEPA - Direct (Region, HQ) |
$0.00 |
$40,620.00 |
($40,620.00) |
0.00% |
| |
| Total Site Costs |
$133,388.00 |
$154,460.00 |
($21,072.00) |
-15.80% |
* The above accounting of expenditures is an estimate based on figures known to the OSC at the time this report was written. The OSC does not necessarily receive specific figures on final payments made to any contractor(s). Other financial data which the OSC must rely upon may not be entirely up-to-date. The cost accounting provided in this report does not necessarily represent an exact monetary figure which the government may include in any claim for cost recovery.
response.epa.gov/GrekaDavisBatterySpill2008
POLREP #15 Last Updated 6/26/2008
|