United
States Environmental Protection Agency
Region IV
POLLUTION REPORT
|
Date: |
Tuesday, July 8, 2008
|
From: |
Leonardo Ceron
|
Subject:
|
Site Removal Activities 90% Complete
Lincoln Metals
248 Foundry Road,
Lincoln, AL
Latitude: 33.6150000 Longitude: -86.1111000
|
POLREP No.: |
6
|
Site #:
|
A4PW
|
Reporting Period: |
7/1/2008 - 7/8/2008
|
D.O. #:
|
|
Start Date: |
5/5/2008
|
Response Authority:
|
CERCLA
|
Mob Date: |
5/12/2008
|
Response Type:
|
Time-Critical
|
Demob Date: |
|
NPL Status:
|
Non NPL
|
Completion Date: |
|
Incident Category:
|
Removal Action
|
CERCLIS ID #: |
ALR000031880
|
Contract #
|
|
RCRIS ID #: |
|
|
Removal activities for this reporting period include: • The ERRS contractor has completed 90% of Site removal activities including • Segregation, treatment and disposal of existing soil stock piles; • Removal of approximately 75% of the former foundry concrete pad and segregated the material; • Shipping treated soil offsite. To date 325 truck loads totaling 9941.85 cubic yards have been shipped offsite for disposal; • And backfilling excavated areas. To date 173 truck loads totaling cubic yards of clean backfill have been delivered to the site.
|
• disposal and transportation of containers and transformers which contain PCB laden oils and additional chemicals found within the old foundry building; • Completion of concrete pad removal and disposal; •Excavation, treatment, and disposal of any residual soils not yet addressed on Site;
|
• Future actions include: Site restoration, including backfilling, grading, placement of topsoil, seeding and providng a straw cover for areas excavated; • Removal of office trailers and heavy machinery from the site; • Grading of office trailer property; • Paving of the existing roads to access the site and fencing the property will also take place.
|
response.epa.gov/Lincolnmetals
|