Site Removal Activities 90% Complete
Lincoln Metals
248 Foundry Road, Lincoln, AL
Latitude: 33.6150000
Longitude: -86.1111000


POLREP No.:
6
Site #:
A4PW
Reporting Period:
7/1/2008 - 7/8/2008
D.O. #:
Start Date:
5/5/2008
Response Authority:
CERCLA
Mob Date:
5/12/2008
Response Type:
Time-Critical
Demob Date:
 
NPL Status:
Non NPL
Completion Date:
 
Incident Category:
Removal Action
CERCLIS ID #:
ALR000031880
Contract #
RCRIS ID #:
 

Site Description

See Polrep #1







Current Activities

Removal activities for this reporting period include:
• The ERRS contractor has completed 90% of Site removal activities including
• Segregation, treatment and disposal of existing soil stock piles;
• Removal of approximately 75% of the former foundry concrete pad and segregated the material;
• Shipping treated soil offsite. To date 325 truck loads totaling 9941.85 cubic yards have been shipped offsite for disposal;
• And backfilling excavated areas.  To date 173 truck loads totaling cubic yards of clean backfill have been delivered to the site.


Planned Removal Actions

• disposal and transportation of containers and transformers which contain PCB laden oils and additional chemicals found within the old foundry building;
• Completion of concrete pad removal and disposal;
•Excavation, treatment, and disposal of any residual soils not yet addressed on Site;


Next Steps

• Future actions include: Site restoration, including backfilling, grading, placement of topsoil, seeding and providng a straw cover for areas excavated;
• Removal of office trailers and heavy machinery from the site;
• Grading of office trailer property;
• Paving of the existing roads to access the site and fencing the property will also take place.