United
States Environmental Protection Agency
Region I
POLLUTION REPORT
|
| Date: |
Monday, August 4, 2008
|
| From: |
Catherine Young, OSC
|
| To: |
Patti Ludwig, EPA Region 1
|
|
|
Subject:
|
Vermont Mill Properties
160-180 Benmont Avenue,
Bennington, VT
Latitude: 42.8844000 Longitude: -73.2022000
|
| POLREP No.: |
3
|
Site #:
|
01EQ
|
| Reporting Period: |
|
D.O. #:
|
|
| Start Date: |
4/7/2008
|
Response Authority:
|
CERCLA
|
Mob Date: |
4/7/2008
|
Response Type:
|
Time-Critical
|
| Demob Date: |
|
NPL Status:
|
Non NPL
|
| Completion Date: |
|
Incident Category:
|
Removal Action
|
| CERCLIS ID #: |
CTN000105857
|
Contract #
|
|
| RCRIS ID #: |
|
|
|
The 2-chlorobenzalmalononitrile(tear gas agent) has been shipped off site for disposal or sale. The manifests for the drums and containers of waste awaiting disposal have been completed.
|
|
Disposal of the remaining waste is scheduled for the end of August. Removal of asbestos located in the area of two, 10,000 gal heating oil tanks is pending final contractor approval. Final decision on the fate of soils sampled at a location behind the mill and adjacent to the Walloomsac River pends OSC review and approval.
|
|
1) Work with PRP to complete transport of drums staged for disposal; 2) Oversee PRP removal of asbestos contaminated material located in area of two, 10,000 gal oil storage tanks; 3)Oversee removal or close-out of two, 10,000 gal oil storage tanks located on the site, in compliance with SPCC regulations; 4) Final determination of fate of soils sampled behind the mill and adjacent to the Walloomsac River.
|
| |
Budgeted |
Total To Date |
Remaining |
% Remaining |
|
Extramural Costs
|
| IAGs |
$2,000.00 |
$0.00 |
$2,000.00 |
100.00% |
| RST/START |
$65,000.00 |
$65,000.00 |
$0.00 |
0.00% |
|
Intramural Costs
|
| USEPA - Direct (Region, HQ) |
$75,000.00 |
$75,000.00 |
$0.00 |
0.00% |
| |
| Total Site Costs |
$142,000.00 |
$140,000.00 |
$2,000.00 |
1.41% |
* The above accounting of expenditures is an estimate based on figures known to the OSC at the time this report was written. The OSC does not necessarily receive specific figures on final payments made to any contractor(s). Other financial data which the OSC must rely upon may not be entirely up-to-date. The cost accounting provided in this report does not necessarily represent an exact monetary figure which the government may include in any claim for cost recovery.
response.epa.gov/VTMillProperties