Personnel On-Scene: 8/9/08 START-2, ERRS-9, Other-1, Security-1 (24 hr) 8/11/08 EPA-1, PADEP-1, START-1, ERRS-9, Other-4, Security-1 (24 hr)
Weather: 08/09/08 Low of 48 °F, high of 77 °F, clear to partly cloudy, 0.00 inches precipitation, wind WSW up to 12 mph. 08/11/08 Low of 51 °F, high of 73 °F, partly cloudy skies, 0.0 inches precipitation, wind NNW at 5 to 12 mph.
08/09/08 Emergency and Rapid Response Services (ERRS) contractor Guardian Environmental Services, Inc. held its morning safety meeting and discussed the days planned activities. ERRS continued repackaging material from badly deteriorated containers into new drums and staging them in Building #2. A total of 1,900 drums of repackaged materials have been staged in Building #2. ERRS conducted maintenance and house-keeping activities on site as required.
START provided technical assistance, contractor oversight and written and photographic documentation during field activities.
08/11/08 ERRS held its morning safety meeting and discussed the days planned activities. ERRS continued repackaging deteriorated drums of materials and staging them in Building #2. ERRS conducted maintenance and house-keeping activities on site as required. Following the identification of bulging lids on five of the 55-gallon drums that contained low level radioactive waste, ERRS removed and replaced lids on five drums of low level radioactive material after it was identified that their lids were bulging. ERRS has repackaged 1,991 drums to date.
START provided technical assistance, contractor oversight and written and photographic documentation during field activities.
|