Personnel On-Scene: 8/14/08 EPA-1, START-1, ERRS-11, Security-1 (24 hr) 8/15/08 START-1, ERRS-11, Security-1 (24 hr)
Weather: 08/14/08 Low of 59 °F, high of 75 °F, clear to partly cloudy, 0.06 inches precipitation, winds averaged 3 mph out of the northeast. 08/15/08 Low of 55 °F, high of 74 °F, partly cloudy skies, 0.00 inches precipitation, wind 5-10 mph out of the northwest.
08/14/08 Emergency and Rapid Response Services (ERRS) contractor Guardian Environmental Services, Inc. held its morning safety meeting and discussed the days planned activities. ERRS continued repackaging material from deteriorated containers into new drums and staging them in Building #2. ERRS continued hazard-categorization testing of waste materials in small containers scattered throughout the site. Categorized material was separated by waste stream in preparation for transportation and disposal from the site. ERRS also conducted standard maintenance and house-keeping activities throughout the site.
START provided technical assistance, contractor oversight and written and photographic documentation during field activities.
08/15/08 ERRS held its morning safety meeting and discussed the days planned activities. ERRS continued repackaging deteriorated drums of magnesium materials. These drums are being staged in Building #2. ERRS completed the hazard-categorization of wastes and the two chemists demobed from the site. ERRS also conducted maintenance and house-keeping activities on site as required.
START provided technical assistance, contractor oversight and written and photographic documentation during field activities.
|