Personnel On-Scene: 09/09/08 ERRS-8, START-1, PADEP-1, Other-1, Security-1 (24 hr) 09/10/08 , EPA-1, ERRS-8, START-1, Other-2, Security-1 (24 hr)
Weather: 09/09/08 Low of 48° F, high of 68° F, rain and fog in morning, overcast in afternoon, 0.47 inches of precipitation, wind NW at 5-10 mph. 09/10/08 Low of 43° F, high of 68° F, fog in morning then mostly sunny, 0.00 inches precipitation, winds generally calm.
09/09/08
Emergency and Rapid Response Services (ERRS) contractor Guardian Environmental, Inc held its morning safety meeting and discussed the days planned activities. ERRS repackaged 60 drums of magnesium during the day. ERRS performed routine grounds-keeping and equipment maintenance. START assisted the EPA as needed, monitored containerized waste for stability using thermal imagery, and conducted written/photographic documentation.
09/10/08 Emergency and Rapid Response Services (ERRS) contractor Guardian Environmental, Inc held its morning safety meeting and discussed the days planned activities. ERRS completed repackaging the abandoned, corroded magnesium drums that were staged on site. A total of 3,493 drums of repackaged magnesium waste are now stored in building 2. ERRS also continued routine equipment maintenance and grounds-keeping. In addition, ERRS moved waste drums from building 7 to building 9 in preparation for transportation and disposal. START assisted the EPA as needed, monitored containerized waste for stability using thermal imagery, and conducted written/photographic documentation.
|