United States Environmental Protection Agency
Region V
POLLUTION REPORT



Date:
Friday, December 12, 2008
From:
Brian Kelly

To:
Jason El-Zein, U.S. EPA
Linda M. Nachowicz, U.S. EPA
Mark Durno, U.S. EPA
Beverly Kush, U.S. EPA
David Chung, U.S. EPA - HQ
Tracy Johnson, U.S. EPA
Michael Chezik, U.S. DOI
David Novak, U.S. EPA
Carol Ropski, U.S. EPA
Mick Hans, U.S. EPA
John Maritote, U.S. EPA
NRC Duty Officer, USCG
Mary Schafer, MDEQ
Milton Scales, MDEQ - EMC
Bruce VanOtteren, MDEQ
Joe Walczak, MDEQ
Amy Keranen, MDEQ
Bill Messenger, EPA
Patrick Hamblin, U.S. EPA
Brian Cooper, U.S. EPA
A Marouf, U.S. EPA
Steve Delong, U.S. NPS
Sharon Baker, DEQ
Virginia Narsete, EPA
Jeff Kelley, U.S. EPA

Subject: 

Initial/Final
Mason Sand Removal
Mason, MI
Latitude: 47.1419000
Longitude: -88.4589000


POLREP No.:
1
Site #:
05S8
Reporting Period:
D.O. #:
Start Date:
11/17/2008
Response Authority:
CERCLA
Mob Date:
11/17/2008
Response Type:
Time-Critical
Demob Date:
11/20/2008
NPL Status:
NPL
Completion Date:
12/11/2008
Incident Category:
Removal Action
CERCLIS ID #:
Contract #
RCRIS ID #:
 

Site Description

Following the July-August 2007 Lake Linden Emergency Response, U.S. EPA initiated a survey of the Torch Lake Area from the Quincy Smelter to the Gay Stampsand deposit. During the survey, the Mason Sands (AOI 10) was identified as having exposed stamp sands that contained elevated arsenic and drums that contained residual waste.


Current Activities

At the request of U.S. EPA's Remedial Branch, U.S. EPA's Removal Branch mobilized to the site on 11/17/08 and removed approximately 30 tons of arsenic contaminated soil and 10 drums containing residual waste.  The area from which contaminated soils were removed was backfilled with clean fill. Prior to backfill, U.S. EPA's FIELDS team conducted XRF screening at the base of the excavation; all arsenic levels were <5 ppm. Laboratory confirmation samples showed the highest level remaining before backfill was 1.6 mg/kg (1.6 ppm).  

Final disposal occurred on December 11, 2008 with shipment of the wastes to Delta Solid Waste Management Authority.


Planned Removal Actions

None


Estimated Costs *
  Budgeted Total To Date Remaining % Remaining
Extramural Costs
ERRS - Cleanup Contractor $40,000.00 $20,000.00 $20,000.00 50.00%
START $5,000.00 $4,000.00 $1,000.00 20.00%
Intramural Costs
 
Total Site Costs $45,000.00 $24,000.00 $21,000.00 46.67%

* The above accounting of expenditures is an estimate based on figures known to the OSC at the time this report was written. The OSC does not necessarily receive specific figures on final payments made to any contractor(s). Other financial data which the OSC must rely upon may not be entirely up-to-date. The cost accounting provided in this report does not necessarily represent an exact monetary figure which the government may include in any claim for cost recovery.


Disposition of Wastes

30 tons of arsenic contamianted soil and 10 drums

Delta Solid Waste Management Authority
5701 19th Avenue North
Escanaba, MI 49829



response.epa.gov/mason

POLREP #1 Last Updated 1/26/2023