United
States Environmental Protection Agency
Region V
POLLUTION REPORT
|
| Date: |
Friday, December 19, 2008
|
| From: |
Stavros Emmanouil/Craig Thomas
|
| To: |
Craig Thomas, USEPA/ERB/RS III
|
Stavros Emmanouil, U.S. EPA/ERB/RS III
|
|
Jason El-Zein, U.S. EPA, ERB 1
|
David Chung, U.S. EPA
|
|
Melinda Dejewskie, City of St. Francis
|
Andrew Boettcher, Wisconsin DNR
|
|
Franklin Lockwood, City of St. Francis
|
Nola Hicks, U.S. EPA
|
|
John Maritote, U.S. EPA
|
Bill Ryczek, U.S. EPA
|
|
Roxanne Chronert, WDNR
|
Linda Nachowicz, U.S. EPA
|
|
Charles Gebien, ERB/RS III
|
|
|
Subject:
|
Continuation of Removal Action
St. Francis Auto Wreckers
4043 South Pennsylvania Avenue,
St. Francis, WI
Latitude: 45.9714000 Longitude: -87.8800000
|
| POLREP No.: |
6
|
Site #:
|
B5LD
|
| Reporting Period: |
12/8/2008 thru 12/12/2008
|
D.O. #:
|
0015
|
| Start Date: |
10/20/2008
|
Response Authority:
|
CERCLA
|
Mob Date: |
10/20/2008
|
Response Type:
|
Time-Critical
|
| Demob Date: |
|
NPL Status:
|
Non NPL
|
| Completion Date: |
|
Incident Category:
|
Removal Action
|
| CERCLIS ID #: |
WID988639068
|
Contract #
|
EP-S5-08-02
|
| RCRIS ID #: |
|
|
|
Continued the on-site treatment of contaminated soils by using quick lime, in order to reduce the TCLP levels of lead. Approximately 300 cubic yards of materials were treated.
Began removing the contents of the excavated drums.
Continued the air monitoring of both the perimeter and the work area.
Collected one composite sample from the treated soils for analysis by an outside lab. Analytical test results indicated that the soil treatment was successful.
Transported and disposed off approximately 75 tons of PCB-contaminated soils.
|
|
Remove and Sample Drums & Containers
Sample soil stockpiles & generate waste profiles
Perform Hazard Categorization
Overpack/Repack Drums & Containers
Excavate/Treat Impacted Soils, as necessary
Transport/Dispose Drums & Impacted Soils
Backfill & Grade Excavated Areas
Restore Site, as necessary
|
|
Continue the on-site treatment of contaminated soils.
Sample the treated material and arrange for disposal.
On-site treatment of the materials that were removed from the excavated drums.
Transportation and disposal of the treated PCB contaminated soils.
|
|
Secure funding for the continuation and completion of the project.
|
| |
Budgeted |
Total To Date |
Remaining |
% Remaining |
|
Extramural Costs
|
| ERRS - Cleanup Contractor |
$892,000.00 |
$285,370.00 |
$606,630.00 |
68.01% |
| RST/START |
$50,980.00 |
$39,387.79 |
$11,592.21 |
22.74% |
|
Intramural Costs
|
| |
| Total Site Costs |
$942,980.00 |
$324,757.79 |
$618,222.21 |
65.56% |
* The above accounting of expenditures is an estimate based on figures known to the OSC at the time this report was written. The OSC does not necessarily receive specific figures on final payments made to any contractor(s). Other financial data which the OSC must rely upon may not be entirely up-to-date. The cost accounting provided in this report does not necessarily represent an exact monetary figure which the government may include in any claim for cost recovery.
| Waste Stream |
Quantity |
Manifest # |
Disposal Facility |
| PCB-Contaminated Soils |
600 Tons |
004697003 JJK; 004697004 JJK; 004697428 through 004697446 JJK; 000193526 VES; 000193526 VES; 000193529 VES |
Wayne Disposal; Belleville, MI |
response.epa.gov/stfrancisautowreckers
POLREP #6 Last Updated 12/23/2008
|