Refer to POLREP #5
Installation of the holding tank to replace the leach field removed as part of the excavation of contaminated soils was completed on October 24, 2006. Final demobilazation from the site was completed by October 25, 2006.
On December 27, 2006, in fulfillment of the requirements of the September 23, 2005 Memorandum of Agreement, final historic recordation reports were mailed to the Town of Chesterfield, NH Division of Historical Resources, NH Department of Environmental Services and the Federal Advisory Council on Historic Preservation.
The removal action has been completed. No further actions are required.
Per the September 25, 2005 MOA, a poster being developed by EPA for the Town of Chesterfield is being developed and is anticpated to be completed in April, 2007.
|
Lead and VOC soil waste-52 loads @ 20,000 kg/load ~ 1,040 tons
Acid batteries (75 lb)
Mercury switches (1 pail)
non-RCRA universal waste-mercury containing lamps (812ft and 7 bulbs)
Waste paint (330 gal)
Waste hydrogen peroxide aqueous soln (55 gal)
Waste corrosive liquid, inorganic (15 gal)
Waste hydrochloric acid (55 gal)
non-DOT, non RCRA State regulated material (1,400 gal)
Hazardous waste liquid (Lead) (55 gal)
|