United Metals

All POLREP's for this site United Metals
Marianna, FL - EPA Region IV
POLREP #2 - Ongoing Clean-Up Action
Printer Friendly  |   PDF
 
On-Scene Coordinator - Richard Jardine 3/14/2006
Time-Critical - Removal Action Pollution Report (POLREP) #2
Start Date: 1/25/2006
Pollution Report (POLREP) #2
Site Description
An estimated 2500 cubic yard soil and debris pile remains at an abandoned battery recycling facility in Marianna, FL.  The soil and debris contain lead and arsenic contamination.

Current Activities
On Monday 13MAR06 ERRS contractor WRS prepared the Site for removal activity by covering property items located in the warehouse with polyethylene sheeting and moving some scrap materials to create a sufficient treatment area within the warehouse.

On Tuesday 14MAR06 WRS began the soil treatment process.  The process is the stabilization of the lead contaminated soil by adding a 1:10 ratio of triple super phosphate and mixing thoroughly.

WRS initially conducted operations in Level"C" PPE.  WRS conducted particulate air monitoring and dust suppression operations to ensure compliance with the Site Safety and Health Plan.

FDEP POC John Sykes visited the Site to assist with oversight.


Planned Removal Actions
Treatment operations should continue until all contaminated soil has been through the treatment process.  After treatment, EPA intends to sample treated soil to ensure a successful operation.  Then EPA will provide for transportation and disposal in a subtitle D landfill.