U.S. flag

An official website of the United States government

Dot gov

Official websites use .gov
A .gov website belongs to an official government organization in the United States.

HTTPS

Secure .gov websites use HTTPS
A lock () or https:// means you’ve safely connected to the .gov website. Share sensitive information only on official, secure websites.

IPC Wilmington Oil Spill

All POLREP's for this site IPC Wilmington Oil Spill
Wilmington, DE - EPA Region III
POLREP #5
Printer Friendly  |   PDF
 
On-Scene Coordinator - Michael Towle/Ann Breslin 7/23/2006
Emergency - Removal Assessment Pollution Report (POLREP) #5
Start Date: 7/17/2006
Pollution Report (POLREP) #5
Site Description
The Site is the location of a discharge of oil (reported as recycled oil) into the International Petroleum Corporation facility's containment system.  The containment system was overwhelmed and oil was released into the adjacent Christiana River. The discharge occurred sometime prior to 2000 hrs. on July 15, 2006, and an estimated 2100 gallons was released  into the Christina River.  The IPC facility collects and recycles used oil from a variety of customers and the discharge occurred during a tank transfer.  Oil discharged to the Christiana River and spread with the tide cycles to the nearby Brandywine Creek and Delaware River.  The Site is located in a mixed commercial/industrial portion of the City of Wilmington of Delaware.

Current Activities
A. RP contractors have collected approximately 1739 gallons of oily liquids from skimming operations since the spill occurred.  Free product collection has been halted as of Friday July 21.      

B. As of Saturday, RP has a total of 30 cleanup contractors working on the river and shoreline.  RP contractors have redeployed additional sorbent pads and booms as needed.  

C. Hard boom remains across the inlet to the Peterson Wildlife Refuge at the Christina River and the adjacent to the dock at the Port of Wilmington on the Christina River.  Sausage boom remains at the inlet to the landfill adjacent to I-495.

D. As of today, RP contractors have collected a total of 10 roll-off boxes of oiled debris from the rivers and banks and oil-soaked sorbent booms/pads.   Additional hard boom and contractor work boats were deconned today.

E. Shoreline Cleanup Assessment Teams (SCATs) surveyed the affected areas.  On Saturday July 22, A SCAT surveyed the east/south bank of the Christina River from the 141 Bridge to the confluence of the Delaware River, on the north/west bank of the Christina River from the confluence of the Delaware River to the 141 Bridge and the entire impacted length of the Brandywine Creek.  On Sunday July 23, a SCAT surveyed from the confluence of the Christina & Delaware River to Battery Park in Old New Castle and surveyed the Christina River from the 141 Bridge to Churchman’s Marsh.    

F. Tri-State Bird Rescue continues to monitor the status of the lightly oiled geese that have eluded capture.   Tri-State released 11 Mallards to the upstream portion of the Brandywine Creek on Saturday July 22 and also released 9 Canada Geese at the Wilmington Youth Rowing Club on Sunday July 23.  The additional captured birds will be released at some point in the near future.  

G. EPA and DNREC received the ‘Draft Cleanup Endpoints and Methods – Christina River Oil Spill’ document from the RP cleanup/NRDA contractor and will review the document prior to approval by the Unified Command.



Planned Removal Actions
Oil recovery operations are underway using booms and oily debris removal devices.  Some remaining oil appears to be currently trapped under the docks at the Port of Wilmington.  Response operations also involve the removal of oiled debris.  Sensitive environments have been boomed where possible.  EPA, the State of Delaware and the Responsible Party formed a Unified Command and had been directing spill response operations.  At this time the EPA OSC determines (in consultation with the USCG and the State of Delaware) that the RP is conducting all appropriate response operations anticipated in the NCP.

Next Steps
A. RP will continue sheen control operations.

B. RP will continue to maintain booms and continue collection of oiled debris.
  
C. EPA, DNREC & START will continue oversight of field activities.

D. SCAT review of affected areas will continue with Federal and State Trustees.