See Initial Pol Rep
On May 12, 2010 Region 4 signed a removal action memorandum to begin the fund lead removal. Please see the AM in the Documents section. Work at the Site began the week of May 26, 2010 with building inspections and demolition. Site work will include air monitoring and sampling of both soil and ground water.
The removal will include the demolition of the existing three buildings and an office trailer. Concrete and asphalt which exceeds the RAL's will also be removed. Surface water which contains hexavalent Chormium in concentratoins above the RAL will be collected and diaposed of accordingly.
Review of data from soils and surface water beneath the concrete and asphalt.
City of Austell water discharge limits.
|