Otsego Township Dam Area

All POL/SITREP's for this site Otsego Township Dam Area
Otsego Township, MI - EPA Region V
POLREP #46
Progress
Printer Friendly  |   PDF
 
U.S. ENVIRONMENTAL PROTECTION AGENCY
POLLUTION/SITUATION REPORT
Otsego Township Dam Area - Removal Polrep

EPA Emergency Response

UNITED STATES ENVIRONMENTAL PROTECTION AGENCY
Region V

Subject: POLREP #46
Progress
Otsego Township Dam Area
059B
Otsego Township, MI
Latitude: 42.4601694 Longitude: -85.7199333


To: Douglas Ballotti, EPA
Samuel Borries, EPA
Mike Ribordy, EPA
Jim Saric, EPA
Mark Mills, MDNR
Polly Synk, MDAG
Cyndi Trobeck, City of Otsego
Valincia Darby, U.S. DOI

From: Paul Ruesch, OSC
Date: 7/20/2018
Reporting Period: 7/7/2018 - 7/20/2018

1. Introduction
  1.1 Background
   
Site Number: 059B    Contract Number:  
D.O. Number:      Action Memo Date: 4/6/2016
Response Authority: CERCLA    Response Type: PRP Oversight
Response Lead: PRP    Incident Category: Removal Action
NPL Status: NPL    Operable Unit: 5
Mobilization Date: 8/1/2016    Start Date: 8/1/2016
Demob Date:      Completion Date:  
CERCLIS ID: MID006007306    RCRIS ID:
ERNS No.:    State Notification: DEQ
FPN#:    Reimbursable Account #: 059B

1.1.1 Incident Category     
Time Critical Removal Action - PRP Oversight

1.1.2 Site Description
See PolRep #1

1.1.2.1 Location
See PolRep #1

1.1.2.2 Description of Threat

See PolRep #1

1.1.3 Preliminary Removal Assessment/Removal Site Inspection Results

See PolRep #1

2. Current Activities
  2.1 Operations Section
   

2.1.1 Narrative
Restoration operations are ongoing in BRSAs 6, 7, 8 & 9. Demobilization activities continue.

2.1.2 Response Actions During Reporting Period

BRSA 6
- Continued restoration of construction entrance & staging area.

BRSA 7
- Continued restoration of riverbanks with seed, straw and native trees/plants;
- Continued re-grading and restoration of staging area;
- Demobilized remaining office trailers and associated infrastructure (i.e., utilities);
- Removed stream tube protection measures; and 
- Emptied, cleaned and demobilized temporary wastewater storage tanks.

BRSA 8
- Continued stabilization of access road; and
- Continued restoration of riverbanks with seed, straw and native trees/plants.

OVERALL SITE
- Continued operation & maintenance of surface water run-off and erosion control measures;
- Continued irrigation of native plants/grasses in all completed BRSAs; and
- Continued restoration activities (grading, contouring, seeding, straw, planting) of area at former dam location (see photo).

2.1.3 Enforcement Activities, Identity of Potentially Responsible Parties (PRPs)

See PolRep #1

2.1.4 Progress Metrics

Both quantities during the reporting period ('Quantity' column) and totals to date ('Total' column) are included in the table.

Waste Stream Medium Quantity Total               Manifest #  Treatment Disposal
 Cardboard solid 20 lbs 1580 lbs NA recycling Otsego Recycling Center
 Plastic solid 20 lbs 865 lbs NA recycling Otsego Recycling Center
 Metals solid 3,274 lbs 47,550 lbs various recycling Broken Arrow Recycling
 Contaminated soil (< 50 ppm* PCBs) solid 0 tons (est) 53,159 tons(est) various disposal Republic Ottawa County Farms Landfill, Coopersville, MI
 Contaminated soil
(> 50 ppm* PCBs)
solid 0 tons 103.91 tons     various disposal US Ecology Michigan,
Belleville, MI
 Contact water liquid 0 gal           2,013,046 gal  NA on-site WWTP On-site reuse/discharge to Kalamazoo River
 Contact water liquid 4,970 gal 69,039 gal various off-site WWTP Liquid Industrial Waste, Holland, MI
*Note: 1 ppm = 1 mg/kg

  2.2 Planning Section
   

2.2.1 Anticipated Activities
During the next reporting period, the following activities are expected to occur:

BRSA 6
- Complete restoration of staging area; and
- Complete restoration of entrance to staging area off of 19th Street.

BRSA 7
- Restore former command center and staging area.

BRSA 8
- Complete stabilization and re-grading of access road along river banks; and
- Complete restoration plantings on river banks.

SITEWIDE
- Complete construction of irrigation system for native trees/plants/grasses in restored areas;
- Continue operation of irrigation system in all restored areas; and
- Continue restoration of area surrounding the former temporary WCS and auxiliary spillway.

2.2.1.1 Planned Response Activities

See Sections 2.2.1 & 2.2.1.2

2.2.1.2 Administrative Activities / Next Steps
- A meeting of project managers, consultants, contractors and PRPs was held on July 18. The purpose of the meeting was to debrief on the project, identify lessons learned, and suggest improvements for future phases of the cleanup (see photo). A tour was conducted of the site to view the progress (see photo).

2.2.2 Issues

  2.3 Logistics Section
    See PolRep #1

  2.4 Finance Section
    No information available at this time.

  2.5 Other Command Staff
   

2.5.1 Safety Officer

A safety meeting is held prior to work start each day by on-site safety officer(s) from Envirocon & Wood Group. Site surveillance continues during weekends to discourage trespassing into work areas and restored riverbank areas. The main purpose of the surveillance patrols is public safety.

2.5.2 Liaison Officer
- A tour was held for agency representatives from MDNR, MDEQ, US EPA and a few local residents on July 17.
- Additional tours with agency executives, elected officials, and non-profit organizations are anticipated over the next month as the project is near completion.

2.5.3 Information Officer
- An updated Fact Sheet is being prepared for distribution prior to a final community meeting (to be announced).

3. Participating Entities
 

3.1 Unified Command

3.2 Cooperating Agencies

See PolRep #1

4. Personnel On Site
 

On average, the following personnel were present on site during the reporting period: 

USEPA - 1
START - 1
MDNR - 1
MDEQ - 1
Envirocon - 31
Spicer Group, Inc. - 1
Wood Group - 1

TOTAL: 37

5. Definition of Terms
  BRSA                 Bank Removal and Stabilization Area
MDEQ                Michigan Department of Environmental Quality
MDNR                Michigan Department of Natural Resources 
OSC                   On Scene Coordinator
PCB    Polychlorinated Biphenyl
PolRep               Pollution Report
PRP                    Potentially Responsible Party
START                Superfund Technical Assessment & Response Team (US EPA contractor)
US EPA              United States Environmental Protection Agency   
WCS                   Water Control Structure
     

6. Additional sources of information
 

6.1 Internet location of additional information/report

https://response.epa.gov/otsegodam

www.epa.gov/superfund/allied-paper-kalamazoo

6.2 Reporting Schedule
The next PolRep will be generated on August 3.

7. Situational Reference Materials
  No information available at this time.


Click here to view Attached Images