Precision Plating Corp. Superfund Site

All POL/SITREP's for this site Precision Plating Corp. Superfund Site
Vernon, CT - EPA Region I
POLREP #1
Initial
Printer Friendly  |   PDF
 
U.S. ENVIRONMENTAL PROTECTION AGENCY
POLLUTION/SITUATION REPORT
Precision Plating Corp. Superfund Site - Removal Polrep
Initial Removal Polrep

EPA Emergency Response

UNITED STATES ENVIRONMENTAL PROTECTION AGENCY
Region I

Subject: POLREP #1
Initial
Precision Plating Corp. Superfund Site
01C8
Vernon, CT
Latitude: 41.8506004 Longitude: -72.4483313


To:
From: Tom Condon, OSC
Date: 6/24/2016
Reporting Period: November 19, 2015 to present

1. Introduction
  1.1 Background
   
Site Number: 01C8    Contract Number: EP-W-08-062
D.O. Number: 0049    Action Memo Date: 9/9/2015
Response Authority: CERCLA    Response Type: Time-Critical
Response Lead: EPA    Incident Category: Removal Action
NPL Status: NPL    Operable Unit:
Mobilization Date: 11/19/2015    Start Date: 11/19/2015
Demob Date:      Completion Date:  
CERCLIS ID:    RCRIS ID:
ERNS No.:    State Notification: CT DEEP has been notified
FPN#:    Reimbursable Account #:

1.1.1 Incident Category
Time-Critical Removal

1.1.2 Site Description

1.1.2.1 Location

The Precision Plating Corp. Superfund Site is located at the Hillside Industrial Park at 1050 Hartford Turnpike (Route 30) in the Town of Vernon, Connecticut, and is surrounded by a mix of light commercial, residential and undeveloped land.  For expediency, the location of the site will be given as the Hillside Industrial Park at 1050 Hartford Turnpike in Vernon, Connecticut.  The approximate geographic center of the site is located at N 41° 51’ 5”, W 72° 29’ 24”.  

 

This Removal Action will specifically address residential and commercial properties where analytical results show concentrations of hexavalent chromium (Cr6) exceeding the Removal Management Level (RML) in drinking water wells.   These properties are all on the portion of the Precision Plating Corp. Superfund Site located along Hartford Turnpike. The term “the Removal Site” will be used to refer specifically to this portion of the Precision Plating Corp. Superfund Site.


1.1.2.2 Description of Threat
The Precision Plating Corp. Superfund Site is on the National Priorities List.  Sampling and analysis of samples from drinking water wells at the site have identified elevated levels of chromium (including Cr6). 

1.1.3 Preliminary Removal Assessment/Removal Site Inspection Results

While conducting a Remedial Investigation/Feasibility Study (RI/FS) at the Site, EPA identified five drinking water wells located along Hartford Turnpike, with Cr6 contamination at concentrations above the RML.  EPA’s Remedial Program requested that EPA’s Emergency Planning and Response Branch (EPRB) review and assess the drinking water well analytical data to determine whether a removal action would be appropriate.  EPRB reviewed available data and determined that a removal action was appropriate. This decision was documented in a Closure Memorandum dated August 18, 2015.  An Action Memorandum was approved on September 9, 2015.  The Action Memorandum authorizes EPA to take action at the Removal Site to provide an alternate water supply for the residences and businesses served by these five wells.


2. Current Activities
  2.1 Operations Section
   

2.1.1 Response Actions to Date

Starting on November 19, 2015, EPA is providing bottled drinking water as a temporary alternate drinking water supply for all of the residents and employees at the Removal Site. 

  2.2 Planning Section
   

2.2.1 Anticipated Activities

2.2.1.1 Planned Response Activities

EPA is planning  to provide water to all residences and commercial properties at the Removal site, by connecting them to a public drinking water supply.

Two of the wells are located on Hartford Turnpike to the southwest of the Hillside Industrial Park.  An existing water main, owned by the Connecticut Water Company (CWC) is in close proximity, and EPA is planning to connect the properties served by these wells  to CWCs water main in the spring.

Two of the wells are located on Hartford Turnpike to the northeast.  The is no existing water main in this area. EPA is planning  to construct an extension of the CWC's water system.  EPA will then connect the properties served by these wells to the water main extension.


 2.2.1.2 Next Steps

EPA's Response Action Contract (RACs) contractor is working to develop design specifcations to be used for the construction of the water line extension.

2.2.2 Issues

None at this time.

  2.3 Logistics Section
    No information to report at this time.

  2.4 Finance Section
    No information available at this time.

  2.5 Other Command Staff
   

2.5.1 Safety Officer

The OSC is acting as the Safety Officer .

2.5.2 Liaison Officer

 The OSC is acting as the Liaison Officer.

2.5.3 Information Officer

An EPA Community Involvement Coordinator has been assigned to the project and is assisting with periodic outreach to the affected residents and property owners.



3. Participating Entities
 

3.1 Unified Command

EPA

3.2 Cooperating Agencies

CT DEEP

Town of Vernon

Connecticut Water Company



4. Personnel On Site
  none at this time

5. Definition of Terms
  No information available at this time.

6. Additional sources of information
 

6.1 Internet location of additional information/report

6.2 Reporting Schedule

periodic



7. Situational Reference Materials
  No information available at this time.