National Petroleum Packers

All POL/SITREP's for this site National Petroleum Packers
Stallings, NC - EPA Region IV
POLREP #10
All ASTs Demolished
Printer Friendly  |   PDF
 
U.S. ENVIRONMENTAL PROTECTION AGENCY
POLLUTION/SITUATION REPORT
National Petroleum Packers - Removal Polrep

EPA Emergency Response

UNITED STATES ENVIRONMENTAL PROTECTION AGENCY
Region IV

Subject: POLREP #10
All ASTs Demolished
National Petroleum Packers
A4QL
Stallings, NC
Latitude: 35.0847089 Longitude: -80.6782999


To:
From: Jeffery Crowley, OSC
Date: 1/21/2011
Reporting Period: 1/8/11 - 1/20/11

1. Introduction
  1.1 Background
   
Site Number: A4QL    Contract Number: EP-S4-07-04
D.O. Number: 105    Action Memo Date: 9/14/2010
Response Authority: CERCLA    Response Type: Time-Critical
Response Lead: EPA    Incident Category: Removal Action
NPL Status: Non NPL    Operable Unit:
Mobilization Date: 9/29/2010    Start Date: 9/29/2010
Demob Date:      Completion Date:  
CERCLIS ID: NCD986232213    RCRIS ID:
ERNS No.:    State Notification: 03/12/2010
FPN#:    Reimbursable Account #:

For Site Actions that occurred prior to this reporting period and background information, please refer to previous Pollution Reports.


2. Current Activities
  2.1 Operations Section
    The following actions took place during this reporting period:
  • ERRS continued to demolish the ASTs and tanker trailers onsite.  During this reporting period, 12 ASTs, 3 tanker trailers, and one box trailer were demolished for a total of 19 tons of steel and 1.9 tons of aluminum scrapped. 
  • ERRS also continued to mix the remianing sludges onsite with the cotton tash.  65,845 gallons of sludges were solidified accounting for 21 loads of material shipped off-site.. 
  • START continued to monitor the air in the vicinity of the tanks and prepare samples for disposal of the solidified materials.
  • No work took place on site on 1/10/11 due to heavy snow and ice.  Work resumed on 1/11/11. 

 

 




  2.2 Planning Section
    2.2.1 Anticipated Activities

    2.2.1.1 Planned Response Activities

During the next reporting period ERRS the following activities are planned:

  • ERRS will solidify and dispose of any remaining sludges onsite;
  • Recyclable materials (tires, steel, aluminum, etc.) will continue to be removed from site;
  • START will conduct soil sampling in probable impacted areas to determine the need for any soil removal;
  • If needed, ERRS will conduct soil removal;
  • ERRS will conduct site restoration activities such as removing impacted concrete, pressure washing impacted surfaces, and grading.

    2.2.1.2 Next Steps

   Beyond the tasks listed above, the installation of a Site monitoring well may be completed if deemed appropriate.


2.2.2 Issues




  2.3 Logistics Section
    At this time, this Site poses no logistical issues.


  2.4 Finance Section
    No information available at this time.

  2.5 Other Command Staff
    No information available at this time.

3. Participating Entities
  No information available at this time.

4. Personnel On Site
  Maximum staffing during this reporting period:

1 - EPA OSC
1 - START (Otie)
6 - ERRS (ER)


5. Definition of Terms
  AST - Above Ground Storage Tank
BTU - British Thermal Unit
CI - Civil Investigator
EPA - Environmental Protection Agency
EPM - Enforcement Project Manager
ERRB - Emergency Response and Removal Branch
ERRS - Emergency and Rapid Response Services
NFPA - National Fire Protection Association
NPP - National Petroleum Packers
OSC - On Scene Coordinator
PPE - Personal Protective Equipment
PRP - Potentially Responsible Party
RFQ - Request For Quote
START - Superfund Technical Assessment and Response Team


6. Additional sources of information
  No information available at this time.

7. Situational Reference Materials
  No information available at this time.


Click here to view Attached Images