Chem Fab Corporation

All POL/SITREP's for this site Chem Fab Corporation
Doylestown, PA - EPA Region III
POLREP #1
Removal Assessment -
Printer Friendly  |   PDF
 
U.S. ENVIRONMENTAL PROTECTION AGENCY
POLLUTION/SITUATION REPORT
Chem Fab Corporation - Removal Polrep
Initial Removal Polrep

EPA Emergency Response

UNITED STATES ENVIRONMENTAL PROTECTION AGENCY
Region III

Subject: POLREP #1
Removal Assessment -
Chem Fab Corporation

Doylestown, PA
Latitude: 40.3160690 Longitude: -75.1356830


To:
From: Cindy Santiago, OSC
Date: 4/14/2010
Reporting Period:

1. Introduction
  1.1 Background
   
Site Number:      Contract Number:  
D.O. Number:      Action Memo Date:  
Response Authority: CERCLA    Response Type: Non-Time-Critical
Response Lead: EPA    Incident Category: Removal Assessment
NPL Status: NPL    Operable Unit:
Mobilization Date: 4/12/2010    Start Date:  
Demob Date:      Completion Date:  
CERCLIS ID:    RCRIS ID:
ERNS No.:    State Notification:
FPN#:    Reimbursable Account #:

2. Current Activities
  2.1 Operations Section
    2.1.1 Narrative

On April 12 and 13 of 2010, EPA installed probes at 9 residential locations and the Doyle Elementary School. The installation consisted in drilling a small hole (about an inch wide) on the basement or first floor (if there was no basement) of each structure. The gaps around the installed probes were sealed with concrete. The probes have a Teflon cap which will prevent them from becoming a pathway for the vapors to enter the structures (if there are vapors underneath).

EPA will return to the Site during the week of April 19, 2010 to connect summa canisters to the probes. The canisters will be collecting air from the sub slabs for a period of 24 hours. Indoor air samples will also be collected simultaneously.


2.1.2 Response Actions to Date

2.1.3 Enforcement Activities, Identity of Potentially Responsible Parties (PRPs)

2.1.4 Progress Metrics

Waste Stream Medium Quantity Manifest # Treatment Disposal
           
           
           



  2.2 Planning Section
    No information available at this time.

  2.3 Logistics Section
    No information available at this time.

  2.4 Finance Section
    No information available at this time.

  2.5 Other Command Staff
    No information available at this time.

3. Participating Entities
  No information available at this time.

4. Personnel On Site
  No information available at this time.

5. Definition of Terms
  No information available at this time.

6. Additional sources of information
  No information available at this time.