Williams Drive

All POL/SITREP's for this site Williams Drive
Ore Knob, NC - EPA Region IV
POLREP #3
Progress Report
Printer Friendly  |   PDF
 
U.S. ENVIRONMENTAL PROTECTION AGENCY
POLLUTION/SITUATION REPORT
Williams Drive - Removal Polrep

EPA Emergency Response

UNITED STATES ENVIRONMENTAL PROTECTION AGENCY
Region IV

Subject: POLREP #3
Progress Report
Williams Drive
B4A2
Ore Knob, NC
Latitude: 36.4010716 Longitude: -81.3333736


To:
From: Terrence Byrd, On Scene Coordinator
Date: 8/15/2011
Reporting Period: August 12, 2011

1. Introduction
  1.1 Background
   
Site Number: B4A2    Contract Number:  
D.O. Number:      Action Memo Date: 6/15/2010
Response Authority: CERCLA    Response Type: Emergency
Response Lead: EPA    Incident Category: Removal Action
NPL Status: NPL    Operable Unit:
Mobilization Date: 6/1/2010    Start Date: 6/1/2010
Demob Date:      Completion Date:  
CERCLIS ID:    RCRIS ID:
ERNS No.:    State Notification:
FPN#:    Reimbursable Account #:


1.1.1 Incident Category - Emergency

1.1.2 Site Description - Contaminated Drinking Water

1.1.2.1 Location - Ashe County, North Carolina

1.1.2.2 Description of Threat - Concentrations of metals that exceed Maximum contaminant levels for drinking and bathing

1.1.3 Preliminary Removal Assessment/Removal Site Inspection Results

Due to growing concern of elevated levels of metals precipitating into groundwater due to acid mine drainage, EPA's Remedial Branch performed a water sampling event in April, 2010. Initial samples were taken in areas believed to have the highest exceedances of metals concentrations with other residences to be sampled shortly thereafter. The samples were taken at the well head outside of the homes and at the water tap inside of the residences. EPA's Remedial Branch and Technical Services Section have analyzed results and determined that homes with a functional water filtration system or water softening device have metal contaminants below risk levels. However, some residences without these devices were determined to have manganese levels that exceed MCLs. Concentrations approaching 10,000 ppb were recorded. OSC Byrd executed an emergency action providing affected residents with potable water based on this information.

2. Current Activities
  2.1 Operations Section
    2.1.1 Narrative

2.1.2 Response Actions to Date
EPA's ERRS contractor has been tasked to provide affected residents with bottled water and explore options to provide affected residents sources of water for dermal contact.  EPA, as a preventative measure, provided potable water to any resident that requested it in addition to households identified to have contaminants that were above Maximum Contaminant Levels (MCLs) or Regional Screening Levels (RSL) (800 ppb for manganeese) in drinking water.  EPA's Remedial Program has taken the lead role in sampling households in the affected area.  
2.1.3 Enforcement Activities, Identity of Potentially Responsible Parties (PRPs)

2.1.4 Progress Metrics

# of Households Sampled # of Households Placed on Potable Water b/c of Possible MCL/RSL Exceedences # of Households Receiving Treatment Systems # of Households with Exceedances After  Proper Installing/Adjustment of System
 87  11  8  0    
           
           



  2.2 Planning Section
   

2.2.1 Anticipated Activities

EPA plans to continue sampling drinking water wells to ensure that no actionable levels of contaminants are being ingested by residents.

2.2.1.1 Planned Response Activities

Initlal and confirmation sampling is ongoing in a limited number of households. 

2.2.1.2 Next Steps

A community meeting was held on August 11, 2011.  Local residents were informed of the conclusion of the time-critical removal activities at the Site, the current status of remedial activities and the cessation of bottled water distribution to redidents that have potable drinking water. 

2.2.2 Issues


Bottled water service is being discontinued for those residences were sampling indicates that there are no health hazards with drinking water.  Sampling results have indicated that the filtration units installed on drinking water wells have reduced the concentration of dissolved metals in water to a level that EPA deems safe for healthy individuals to drink.

  2.3 Logistics Section
    No information available at this time.

  2.4 Finance Section
    No information available at this time.

  2.5 Other Command Staff
    2.5.1 Safety Officer


2.6 Liaison Officer


2.7 Information Officer


2.7.1 Public Information Officer

2.7.2 Community Involvement Coordinator:  Sheryl Carbonaro


3. Participating Entities
  No information available at this time.

4. Personnel On Site
  No information available at this time.

5. Definition of Terms
  No information available at this time.

6. Additional sources of information
  No information available at this time.

7. Situational Reference Materials
  No information available at this time.