Williams Drive

All POL/SITREP's for this site Williams Drive
Ore Knob, NC - EPA Region IV
POLREP #4
Final POLREP
Printer Friendly  |   PDF
 
U.S. ENVIRONMENTAL PROTECTION AGENCY
POLLUTION/SITUATION REPORT
Williams Drive - Removal Polrep
Final Removal Polrep

EPA Emergency Response

UNITED STATES ENVIRONMENTAL PROTECTION AGENCY
Region IV

Subject: POLREP #4
Final POLREP
Williams Drive
B4A2
Ore Knob, NC
Latitude: 36.4010716 Longitude: -81.3333736


To:
From: Terrence Byrd, On Scene Coordinator
Date: 9/24/2012
Reporting Period: 8/12/2011 - 9/24/2012

1. Introduction
  1.1 Background
   
Site Number: B4A2    Contract Number:  
D.O. Number:      Action Memo Date: 6/15/2010
Response Authority: CERCLA    Response Type: Emergency
Response Lead: EPA    Incident Category: Removal Action
NPL Status: NPL    Operable Unit:
Mobilization Date: 6/1/2010    Start Date: 6/1/2010
Demob Date: 11/30/2011    Completion Date: 11/30/2011
CERCLIS ID:    RCRIS ID:
ERNS No.:    State Notification:
FPN#:    Reimbursable Account #:


1.1.1 Incident Category - Emergency

1.1.2 Site Description - Contaminated Drinking Water

1.1.2.1 Location - Ashe County, North Carolina

1.1.2.2 Description of Threat - Concentrations of metals that exceed Maximum contaminant levels for drinking and bathing

1.1.3 Preliminary Removal Assessment/Removal Site Inspection Results

Due to growing concern of elevated levels of metals precipitating into groundwater due to acid mine drainage, EPA's Remedial Branch performed a water sampling event in April, 2010. Initial samples were taken in areas believed to have the highest exceedances of metals concentrations with other residences to be sampled shortly thereafter. The samples were taken at the well head outside of the homes and at the water tap inside of the residences. EPA's Remedial Branch and Technical Services Section have analyzed results and determined that homes with a functional water filtration system or water softening device have metal contaminants below risk levels. However, some residences without these devices were determined to have manganese levels that exceed MCLs. Concentrations approaching 10,000 ppb were recorded. OSC Byrd executed an emergency action providing affected residents with potable water based on this information.

2. Current Activities
  2.1 Operations Section
    2.1.1 Narrative

2.1.2 Response Actions to Date
EPA's ERRS contractor has been tasked to provide affected residents with bottled water and explore options to provide affected residents sources of water for dermal contact.  EPA, as a preventative measure, provided potable water to any resident that requested it in addition to households identified to have contaminants that were above Maximum Contaminant Levels (MCLs) or Regional Screening Levels (RSL) (800 ppb for manganeese) in drinking water.  EPA's Remedial Program has taken the lead role in sampling households in the affected area.  
2.1.3 Enforcement Activities, Identity of Potentially Responsible Parties (PRPs)

2.1.4 Progress Metrics

# of Households Sampled # of Households Placed on Potable Water b/c of Possible MCL/RSL Exceedences # of Households Receiving Treatment Systems # of Households with Exceedances After  Proper Installing/Adjustment of System
 87  11  8  0    
           
           



  2.2 Planning Section
   

2.2.1 Anticipated Activities

Due to the linkage between the contamination at this site and the contamination at the NPL listed Ore Knob Mine Site, the potable water sampling and filtration installation has been assumed by the Remedial Program to coincide with this long term remedial project.

2.2.1.1 Planned Response Activities

Water sampling,system installation and maintenance will continue though the oversight of the Remedial Program. 

2.2.1.2 Next Steps

ERRB has demobilized from the Site and has no further plans for any other emergency response actions.

2.2.2 Issues


None

  2.3 Logistics Section
    No information available at this time.

  2.4 Finance Section
    No information available at this time.

  2.5 Other Command Staff
    2.5.1 Safety Officer


2.6 Liaison Officer


2.7 Information Officer


2.7.1 Public Information Officer

2.7.2 Community Involvement Coordinator:  Sheryl Carbonaro

3. Participating Entities
  No information available at this time.

4. Personnel On Site
  No information available at this time.

5. Definition of Terms
  No information available at this time.

6. Additional sources of information
  No information available at this time.

7. Situational Reference Materials
  No information available at this time.