1. Introduction
|
|
1.1 Background
|
|
|
Site Number: |
01FQ |
|
Contract Number: |
EP-W-08-062 |
D.O. Number: |
|
|
Action Memo Date: |
7/7/2010 |
Response Authority: |
CERCLA |
|
Response Type: |
Time-Critical |
Response Lead: |
EPA |
|
Incident Category: |
Removal Action |
NPL Status: |
Non NPL |
|
Operable Unit: |
N/A |
Mobilization Date: |
4/27/2011 |
|
Start Date: |
4/28/2011 |
Demob Date: |
6/30/2011 |
|
Completion Date: |
9/22/2011 |
CERCLIS ID: |
MAD019426238 |
|
RCRIS ID: |
MAD019426238 |
ERNS No.: |
N/A |
|
State Notification: |
3-18126 |
FPN#: |
|
|
Reimbursable Account #: |
|
1.1.1 Incident Category
See POLREP#5
1.1.2 Site Description
See POLREP #5
1.1.2.1 Location
See POLREP #5
1.1.2.2 Description of Threat
See POLREP #5
|
2. Current Activities
|
|
2.1 Operations Section
|
|
|
2.1.1 Narrative
The purpose of this POLREP is to document a short remobilization to the site to repair response related damage at the residential property at 51 Hoffman Ave.
2.1.2 Response Actions to Date
See previous POLREPs for actions prior to 6/11/2012.
ERRS mobiliized on this date, 6/22/2012, to repair and refinish the concrete patio surface to a more slip resistant surface typical of patios using a concrete coating product treatment. The work took several hours and ERRS demobilized today, 6/22/2012, upon completion of the work.
2.1.3 Enforcement Activities, Identity of Potentially Responsible Parties (PRPs)
See previous POLREPS.
2.1.4 Progress Metrics
|
|
2.2 Planning Section
|
|
|
2.2.1 Anticipated Activities
2.2.1.1 Planned Response Activities
None, work complete.
2.2.1.2 Next Steps
None, work complete.
2.2.2 Issues
This project was quite sensitive to the residents, who were concerned about any impacts to their yard. This method was optimal, the product seems to have met the project objective and met the residents concerns.
|
|
2.3 Logistics Section
|
|
|
No information available at this time.
|
|
2.4 Finance Section
|
|
|
No information available at this time.
|
|
2.5 Other Command Staff
|
|
|
No information available at this time.
|
3. Participating Entities
|
|
3.1 Unified Command
Not applicable
3.2 Cooperating Agencies
None at this time.
|
4. Personnel On Site
|
|
During the work on 6/22/2012:
ERRS: 1
ERRS Subcontractor: 2
EPA: 1
At conclusion of work: 0
|
5. Definition of Terms
|
|
No information available at this time.
|
6. Additional sources of information
|
|
No information available at this time.
|
7. Situational Reference Materials
|
|
No information available at this time.
|