Pine Ridge Reservation Landfill Fire

All POL/SITREP's for this site Pine Ridge Reservation Landfill Fire
Red Shirt, SD - EPA Region VIII
POLREP #3
Final Polrep
Printer Friendly  |   PDF
 
U.S. ENVIRONMENTAL PROTECTION AGENCY
POLLUTION/SITUATION REPORT
Pine Ridge Reservation Landfill Fire - Removal Polrep
Final Removal Polrep

EPA Emergency Response

UNITED STATES ENVIRONMENTAL PROTECTION AGENCY
Region VIII

Subject: POLREP #3
Final Polrep
Pine Ridge Reservation Landfill Fire
A809
Red Shirt, SD
Latitude: 43.4692900 Longitude: -102.8751700


To: Suzy Mesteth, Oglala Sioux Tribe
Hobert Yankton, Oglala Sioux Tribe
Brent Rohlfs, Indian Health Service
Anthony Kathol, Indian Health Service

From: Paul Peronard, EPA OSC
Martin McComb, EPA OSC
Date: 6/30/2011
Reporting Period: 06/19/2011 thru 0624/2011

1. Introduction
  1.1 Background
   
Site Number: A809    Contract Number:  
D.O. Number:      Action Memo Date: 6/19/2011
Response Authority: CERCLA    Response Type: Emergency
Response Lead: EPA    Incident Category: Removal Action
NPL Status:    Operable Unit:
Mobilization Date: 6/12/2011    Start Date: 6/10/2011
Demob Date: 6/25/2011    Completion Date: 6/24/2011
CERCLIS ID:    RCRIS ID:
ERNS No.:    State Notification:
FPN#:    Reimbursable Account #:

1.1.1 Incident Category

Other - Landfill Fire

1.1.2 Site Description

At approximately 17:00 on June 9, 2011, EPA Region 8's Emergency Response Program received a referral from EPA personnel working with the Oglala Sioux Tribe (OST) regarding a landfill fire on the Pine Ridge Reservation in South Dakota.  The phone duty EPA On-Scene Coordinator (OSC) contacted the local landfill manager, Tribal representatives and Indian Health Service (IHS) personnel.  Reports from the scene, including video and photographs, depicted a large, uncontrolled fire at the landfill’s main repository cell.  Local attempts to cover the area with soil were not successful and nearly resulted in a serious situation when an OST bulldozer operator and his equipment began sinking into the smoldering debris.  The local fire department responded to the fire but declined to become involved indicating that they did not have the proper equipment to fight the fire.  EPA OSC Paul Peronard deployed to the Pine Ridge Landfill Fire Site (Site) on June 12, 2011.

The Site is the sole landfill for the Pine Ridge Reservation and is a Subtitle D solid waste facility. The landfill has been in operation for less than 10 years and accepts waste from 11 transfer stations throughout the reservation.  The landfill services approximately 30,000 people including the communities of Pine Ridge and Kyle.  Approximately 50 tons of municipal solid waste is deposited at the landfill on a daily basis.

Because there is no alternate facility and storage at the various transfer stations is limited, trash and potentially hazardous solid waste continues to be trucked into the landfill.

1.1.2.1 Location

The landfill is located 13 miles south of Red Shirt along BIA Highway 41 in southwest South Dakota.  Approximate GPS coordinates are 43.469 north latitude and -102.875 west longitude.

The property is owned and operated by the
Oglala Sioux Tribe.  The Federal Indian Health Service (IHS) provides technical support.

1.1.2.2 Description of Threat

Use of the landfill is largely unrestricted.  There is no gate and the facility is, for the most part, left unattended.  Landfill personnel, workers hauling daily loads, tribal members dropping off garbage, motorists along BIA Highway 41 and frequent scavengers are all at risk of exposure to a noxious plume of gases that is generated by the combustion of hazardous substances in the landfill. 

As previously mentioned, there is no other facility capable of handling the reservation’s waste stream, even on a temporary basis.   In addition, if the landfill were to be closed because of the fire, household waste would begin to back up throughout the reservation and public health will be impacted.

1.1.3 Preliminary Removal Assessment/Removal Site Inspection Results

During his Preliminary Removal Assessment on June 12, 2011, OSC Peronard confirmed the conditions identified by the landfill operator and IHS.  When he arrived on the scene, the fire had progressed to include approximately 70 percent (~7 acres) of the landfill's footprint and a noxious plume had inundated nearby BIA Highway 41.  Initial measurements taken on June 13, 2011 indicated decreased levels of oxygen and elevated levels of particulates, VOCs and carbon monoxide.  The initial Response Team observed the explosive release of pockets of gas as well as both breached and intact gas canisters.  Local contacts indicated that waste is not screened for hazardous materials before it is deposited in the landfill and evidence of hazardous substances (pesticide containers, paint cans, small drums, etc) was visibly evident throughout the extent of the fire.  

The landfill operators are subject to limited resources and have been unable to apply consistent cover and compaction.  As a result, OSC Peronard determined that the fire could be expected to burn indefinitely with a furnace-like airflow moving through poorly compacted layers of waste and uncovered trash 10-12 feet deep providing fuel.



2. Current Activities
  2.1 Operations Section
   

2. Current Activities

 

2.1 Operations Section

 

 

2.1.1 Narrative

The Response Actions discussed in this POLREP are based on traditional measures for the suppression of a landfill fire: cover and compaction.  Of critical importance is the availability of soil and the use of suitable earth moving equipment (excavators, haul trucks, bulldozers and compactors).  Site specific factors influencing these Response Actions include:

  • The Site is one-hour from Rapid City, SD which is the nearest town with suitable support services
  • The nearest water source is 13 miles away in Red Shirt, SD
  • Frequent rain, lack of vegetative cover and the high clay content in the local soils create muddy and slick conditions on Site

2.1.2 Response Actions to Date

Monday, June 20, 2011:

The burning area of the landfill has been completely compacted and 70% covered.  No smoke ore smoldering debris have been observed since late on June 19, 2011.  The ERRS crews continue to place cover material over the burn area and compact the affected area.  The weather contiues to be stormy, requiring periodic work stoppages due to lightning and muddy conditions.

Tuesday, June 21, 201 Thru Friday, June 24, 2011

OSC Peronard directed the ERRS crew to spread, cover, and compact the remaining trash and debris in the landfill to eliminate the possibility of re-ignition.  This is completed by the afternoon of June 24, 2011.  A stockpile of approximately 1500 cubic yards of cover material remained.  Based on discussions with Mr. Hobart Yankton (OST Solid Waste Director) it was decided to leave this stockpile, as well as the roads built to access the cover material borrow area, in place for future use by the Tribe.  As operations began winding down crews had begun to decon equipment and prepare for demobilization.  The EPA Mobile EOC is demobilized on June 23, 2011.
 
Saturday, June 25, 2011: Demobilization

The decontamination of equipment is complete.  All crews and equipment demobilize from the Site.SC Peronard met with Hobert Yankton, the OST's Director of Solid Waste, to discuss landfill operations and possible response actions.

2.1.3 Enforcement Activities, Identity of Potentially Responsible Parties (PRPs)

2.1.4 Progress Metrics

  • At this time all work on-site is complete. 



  2.2 Planning Section
   

2.2 Planning Section

2.2.1 Anticipated Activities

Work is complete.

2.2.1.1 Planned Response Activities


See Section 2.2.1.1.

2.2.2 Issues


None to report.



  2.3 Logistics Section
   

2.3 Logistics Section

 


Not Applicable.



  2.4 Finance Section
    No information available at this time.

  2.5 Other Command Staff
    2.5.1 Safety Officer

2.5 Safety Officer


Not Applicable. 



2.6 Liaison Officer

2.6 Liaison Officer


Not Applicable.



2.7 Information Officer

2.7 Information Officer

 

2.7.1 Public Information Officer

Newspaper articles and radio news coverage of the Site appeared in several local outlets on June21-23, 2011..

2.7.2 Community Involvement Coordinator

Not Applicable.



3. Participating Entities
  3.1 Unified Command

3. Participating Entities

 

3.1 Unified Command

 

 


Not Applicable.

 

 

 




3.2 Cooperating Agencies

3.2 Cooperating and Assisting Agencies


Oglala Sioux Tribe (OST)

United States Indian Health Service (IHS)



4. Personnel On Site
 

4. Personnel On Site


Paul Peronard - U.S. Environmental Protection Agency (EPA) On-Scene-Coordinator
Martin McComb - U.S. EPA On-Scene Coordinator

Terry Henderson - Emergency and Rapid Response Services (ERRS) Contractor, Removal Manager
Vince Parker - ERRS Contractor, Foreman and Equipment Operator
Miguel Lacherre - ERRS Contractor, Field Accountant
Steve Harrington - ERRS Contractor, Equipment Operator
Kory Martin - ERRS Contractor, Equipment Operator
Joseph Cordova - ERRS Contractor, Equipment Operator
Bob Coulter - ERRS Contractor, Equipment Operator
Renny Dutton - ERRS Contractor, Laborer

All demobilized as of June 25, 2011.



5. Definition of Terms
  5. Definition of Terms

6. Additional sources of information
  6.1 Internet location of additional information/report
6. Additional sources of information

6.1 Internet location of additional information/reports


http://www.epaosc.org/pineridgefire



6.2 Reporting Schedule
6.2 Reporting Schedule

7. Situational Reference Materials
  7. Situational Reference Materials


Click here to view Attached Images