1. Introduction
|
|
1.1 Background
|
|
|
Site Number: |
B4K2 |
|
Contract Number: |
EP-S4-07-04 |
D.O. Number: |
130 |
|
Action Memo Date: |
6/30/2011 |
Response Authority: |
CERCLA |
|
Response Type: |
Time-Critical |
Response Lead: |
EPA |
|
Incident Category: |
Removal Action |
NPL Status: |
Non NPL |
|
Operable Unit: |
|
Mobilization Date: |
6/22/2011 |
|
Start Date: |
6/22/2011 |
Demob Date: |
5/1/2012 |
|
Completion Date: |
5/1/2012 |
CERCLIS ID: |
SCD987673458 |
|
RCRIS ID: |
|
ERNS No.: |
|
|
State Notification: |
6/21/2011 |
FPN#: |
|
|
Reimbursable Account #: |
|
For background information including Site Description, Location, and Description of Threat please refer to previous POLREPs.
|
2. Current Activities
|
|
2.1 Operations Section
|
|
|
2.1.1 Narrative
EPA has transitioned from the Emergency Response Phase of the project into the Time-Critical Removal Phase. However, the dangers at the Site continue to pose an immediate threat to human health and the environment. The current focus at the Site is to mitigate the immediate threats of release from the Site to off-site migration pathways. EPA's estimated time to complete the removal is approximately April 30, 2012.
2.1.2 Response Actions to Date
To date the following response activities were completed during this reporting period:
ERRS finished transporting the remaining contaminated soil (stockpile #23T and 24) to an approved landfill.
ERRS then started and completed the following site restoration activities.
- Graded the property to slow down water runoff,
- installed erosion mats on the southern slope of the property and the banks of the creek,
- planted tree saplings and wetland plants
- spread topsoil, and hydro-seeded the area.
ERRS took some of the clean concrete from the site and used it for erosion control. The concrete came from under a portion of a building that contained an office and had no chemical contamination and no contamination was found under that section of the building.
ERRS started demobilizing equipment the week of April 23 and final demobilization of personnel on May 1, 2012.
2.1.4 Progress Metrics
Waste Stream |
Medium |
Quantity |
Treatment |
Disposal |
Non-Hazardous, Arsenic and Cadmium Contaminated Soil (Total soil) |
Soil |
10,140 tons |
None |
Upstate Regional MSW Subtitle D Landfill |
Hazardous, Cadmium Contaminated Soil Treated On-Site |
Soil |
3,344 tons |
Free Flow 300/200 |
Treated on Site |
Magnesium Oxide |
Bulk |
4 tons |
None |
Upstate Regional MSW Subtitle D Landfill |
Scrap Metal |
Scrap Metal |
30.97 tons |
Cleaned |
Belton Metals Recycling |
Empty Drums |
Metal |
3.4 tons |
Cleaned |
Upstate Regional MSM Subtitle D Landfill |
Non-friable Asbestos |
Vinyl Floor Tiles with Mastic |
1 cubic yd |
None |
Enterprise C&D Landfill (TSCA) |
Cement Pad |
Cement |
401 tons |
|
Upstate Regional MSM Subtitle D Landfill |
4ft and 8ft Flourescent Bulbs |
|
384 bulbs |
|
EQ Detroit |
Acid Waste Totes |
Liquid |
4069 lbs |
None |
EQ Detroit |
Acid Drums |
Liquid |
291 gallons |
|
EQ Detroit |
Acid Solid |
Bags |
200 lbs |
|
EQ Detroit |
Cuastic Drums |
Liquids |
495 gallons |
|
EQ Detroit |
Caustic Drum |
Solid |
14 lbs |
|
EQ Detroit |
Oxidizer/Acid |
Liquid |
3750 lbs |
|
EQ Detroit |
Oxidizer/Acid |
Liquid |
275 gallons |
|
EQ Detroit |
Arsenic |
Liquid |
17,500 lbs |
|
EQ Detroit |
Oxidizer |
Solid |
555 lbs |
|
EQ Detroit |
Neutral Arsenic/Selenium |
Solid |
24,700 lbs |
|
EQ Detroit |
Flammable |
Liquid |
2,450 lbs |
|
EQ Detroit |
Flammable |
Solid |
1,150 lbs |
|
EQ Detroit |
Arsenic |
Solid |
2,400 lbs |
|
EQ Detroit |
Methanol |
Liquid |
920 lbs |
|
EQ Detroit |
Neutral |
Liquid |
1,800 lbs |
|
EQ Detroit |
Acid Drums |
Solid |
35 drums |
|
EQ Detroit |
Oxidizer/Acid Drum |
Solid |
550 lbs |
|
EQ Detroit |
|
|
2.2 Planning Section
|
|
|
2.2.1 Anticipated Activities
All site activities have been completed and the Site has been returned to its owner.
2.2.1.1 Planned Response Activities
None
|
|
2.3 Logistics Section
|
|
|
No information available at this time.
|
|
2.4 Finance Section
|
|
|
No information available at this time.
|
|
2.5 Other Command Staff
|
|
|
No information available at this time.
|
3. Participating Entities
|
|
3.1 Unified Command
3.2 Cooperating Agencies
The following Agencies are Cooperating in the cleanup:
South Carolina Department of Health and Environmental Control
Anderson County Fire Department
Anderson County Sheriff's Office
Anderson County Emergency Services Department
United States Army Corps of Engineers
|
4. Personnel On Site
|
|
Maximum on-site personnel for reporting period:
USEPA OSC - 1
ERRS (ER) - 4
START (OTIE) - 1
DHEC -0
US Army Corps of Engineers - 1
|
5. Definition of Terms
|
|
ACM - Asbestos Containing Material
EPA - Environmental Protection Agency
EPM - Enforcement Project Manager
ERRB - Emergency Response and Removal Branch
ERRS - Emergency and Rapid Response Services
ERT - Environmental Response Team
MCL - Maximum Contaminant Level
OSC - On Scene Coordinator
PCB - Polychlorinated biphenal
PPE - Personal Protective Equipment
PRP - Potentially Responsible Party
RAL - Removal Action Level
RSE - Removal Site Evaluation
RSL - Removal Screening Level
RFQ - Request For Quote
SCDHEC - South Carolina Department of Health and Environmental Control
START - Superfund Technical Assessment and Response Team
TCLP - Toxicity Characteristic Leachate Procedure
USACE - United Stated Army Corps of Engineers
XRF - X-Ray Fluorescence
|
6. Additional sources of information
|
|
No information available at this time.
|