Lobeco Products

All POL/SITREP's for this site Lobeco Products
Seabrook, SC - EPA Region IV
POLREP #3
Remobilization and Off-Site Removal of Containerized Waste
Printer Friendly  |   PDF
 
U.S. ENVIRONMENTAL PROTECTION AGENCY
POLLUTION/SITUATION REPORT
Lobeco Products - Removal Polrep

EPA Emergency Response

UNITED STATES ENVIRONMENTAL PROTECTION AGENCY
Region IV

Subject: POLREP #3
Remobilization and Off-Site Removal of Containerized Waste
Lobeco Products
B4N5
Seabrook, SC
Latitude: 32.5556550 Longitude: -80.7294280


To:
From: Terry Stilman, On-Scene Coordinator
Date: 7/25/2012
Reporting Period: June 1 - July 20, 2012

1. Introduction
  1.1 Background
   
Site Number: B4N5    Contract Number:  
D.O. Number:      Action Memo Date: 1/17/2012
Response Authority: CERCLA    Response Type: Emergency
Response Lead: EPA    Incident Category: Removal Action
NPL Status: Non NPL    Operable Unit:
Mobilization Date: 1/17/2012    Start Date: 1/17/2012
Demob Date:      Completion Date:  
CERCLIS ID:    RCRIS ID:
ERNS No.:    State Notification:
FPN#:    Reimbursable Account #:

1.1.1 Incident Category

1.1.2 Site Description

The LP site operated as a specialty chemical manufacturer for more than 40 years, from 1966 to 2009.  The product lines included dyes, farm chemicals, drilling fluid chemicals, herbicides, pesticides, and general specialty chemicals.  The property has been abandoned since December of 2010, with power off to most or all of the property.


The property includes 125 acres of land surrounded by agricultural, rural residential, and undeveloped property.  The closest crossroad is Keans Neck Road, located to the northeast.  Currently the site includes a portion of the chemical processing structures, a storage/warehouse, a lab testing area, offices and the waste water treatment facility.  Part of the processing facility has been demolished but the rubble remains onsite. 

 


1.1.3 Preliminary Removal Assessment/Removal Site Inspection Results

The site was initially owned by Tenneco Chemicals, Inc. The Tenneco Chemicals Berkshire Color Division constructed the plant for the production of dyestuff intermediates in 1967.   
 

While operating under Tenneco the facility used Monsanto Corporation’s Aroclor 1248 PCB product as a heat transfer oil.  The hot oil system in which Aroclor 1248 was used malfunctioned at times.  Untreated liquids from an on-site lagoon were discharged directly into an adjacent stream, Whale Branch, which flows into Campbell Creek, and ultimately the Atlantic Ocean.   In 1983 SC DHEC conducted an in-stream assessment of Campbell Creek and Whale Branch.  A follow up SC DHEC study in December 1984 revealed the presence of PCBs in the immediate vicinity of the Lobeco plant effluent discharge point.  As a result of this finding the facility conducted groundwater testing and produced a groundwater monitoring report which revealed the presence of PCBs at the Lobeco Plant. 

 

Based on this information Tenneco Products commissioned further tests in order to characterize the extent and location of the PCBs at the Lobeco Plant.  Initial soil borings indicated the presence of PCBs in the abandoned lagoon.  In 1986 G & E Engineering, hired by SC DHEC, issued a preliminary investigation report pinpointing the location of the PCB contamination at the lagoon and burn site areas. In 1987, under the first of three SC DHEC consent orders, cleanup of the PCBs commenced and was concluded by November 1991. A subsequent well survey of residential wells was performed and found no PCB contamination of groundwater existed in the neighboring wells. 

Based on a DHEC request for assistance, EPA's Emergency Response and Removal Branch (ERRB) conducted an initial site walkthrough in November 2011 to determine potential sampling locations.  During the Site visit, approximately 9 - 250 gallon totes of suspected acid and several drums were found scattered throughout the Site.  In addition, several above ground storage tanks labeled sulfuric acid and a debris pile containing suspected asbestos materials were observed.

Plans for sampling of the containers, the debris pile and an on-site waste treatment plant were discussed with DHEC.  A subsequent sampling plan was prepared by EPA's START contractor for review by ERRB and DHEC.

EPA's Site Investigation Section and DHEC also planned to conduct sampling of potentially contaminated soils, sediment and surface water, focusing on longer-term contamination issues. 

During the week of January 10, 2012, DHEC conducted its site investigation sampling event, focusing on the former lagoons, settling ponds, and the NPDES outfall into Whale Branch. Several soil samples from areas of interest were also collected.

On January 17, 2012, OSCs Stilman and Berry, arrived at the Site with EPA's START contractor to conduct a sampling assessment of containers at the facility.  During that assessment, tanks, drums and other containers in poor condition of hazardous substances were found on-site.  Conditions at the Site were appreciably worse than in November 2011.  Due to the presence of these containers, the EPA OSC activated EPA's clean-up contractor to stabilize the conditions on-site and prevent a release.  From January 18 until January 20, 2012, crews collected all portable containers from around the site, transferring material to secure containers where needed.  START opened and sampled each container and then performed field hazard characterization tests on those samples.  Additionally, ERRS used a boom lift to reach access ports on the tops of the ASTs around the site.  Some of the ASTs were found to contain several thousand gallons of unknown liquids.  These were also sampled (where possible) and field tested. 

START also completed sample collection of the concrete impoundments and large ASTs at the wastewater treatment plant.  Samples of the water within each impoundment and any sediment found therein were collected and submitted to an analytical laboratory for analysis.

All sample results from the waste water treatment system, lagoons, and impoundments showed no analytes of concern above any human-health benchmarks which would require a response action. Containerized waste, however, showed several different waste streams that were determined to be hazardous to human health or the environment. These are discussed in Section 2.1.


2. Current Activities
  2.1 Operations Section
    2.1.1 Narrative

2.1.2 Response Actions to Date
On January 17, 2012, OSCs Stilman and Berry, arrived at the Site with EPA's START contractor to conduct a sampling assessment of the facility.  Upon arrival, OSCs Stilman and Berry observed the totes of suspected acid to be bulging and generally in poor condition.  Based on the presence of containers of hazardous substances in poor condition and the lack of on-site facility personnel, OSC Stilman activated EPA's ERRS contractor (ER) to conduct stabilization actions.

On January 18, 2012, ERRS arrived on site and transferred the acid into new totes.  Additionally, EPA, START, and ERRS inventoried the contents of the on-site former quality control laboratory.  After reviewing the inventory and in consultation with ERRS and START, OSC Berry determined that many of the lab chemicals were neutral, nonreactive material, and the safest approach was to bulk these solids and liquids into two large containers, which ERRS performed in Level B personal protective equipment. Additionally, several of the additional waste streams, such as flammable liquids and oils, were also consolidated into existing waste streams on site.  Some chemicals whose compatibility was unknown were left to be lab packed at a later date.  No reactions were observed during any of the bulking. Some chemicals in the lab refrigerator were found to have ruptured and crystallized on the door.  These were also left untouched until a chemist could definitively identify the chemicals and gauge their danger.

ERRS used a boom lift to reach access ports on the tops of the ASTs around the site.  Most ASTs were found to be empty, but several were found to contain several thousand gallons of unknown liquids.  These were also sampled (where possible) and field tested. One tank was found to have at least several hundred gallons of sulfuric acid.

Once bulking was complete, START, ERRRS, and OSC Berry designed preliminary waste streams and composite samples of each waste stream were collected.  There are 8 general waste types: acid liquids, basic liquids, flammable liquids, petroleum liquids, neutral liquids, chlorides, oxidizers, and bulk solids. A total of 11 samples were submitted for analysis. ERRS used these samples to profile waste streams for disposal, and a disposal company was found to handle transportation and disposal of these containers.

On July 16, 2012, EPA and ERRS returned to the site to finalize the off-site shipment of all containerized wastes. ERRS' chemist went through the remaining chemicals in the laboratory and lab-packed them for disposal. Technicians went through the southern building and moved all waste to the northern warehouse, where there was a loading dock that trucks could utilize. All containers were inventoried, labeled, and placarded as required by DOT. Overpacks were used to protect any damaged containers. On Friday, July 20, all containerized waste was shipped off site for disposal at EPA-approved facilities.

EPA and ERRS originally planned to neutralized an on-ste sulfuric acid tank in place and not ship it off-site for disposal.  However, after managing to remove the manhole from the top of the tank, which provided much better access than the 2-inch port that was available during the initial assessment, it was determined that the tank has well over 1,000 gallons of liquid and at least 2 feet of sludge. A bench-scale test was performed, and it was determined that over 5 tons of neutralizing agent (Na2CO3) would be needed to neutralize what was determined to be nearly 1,200 gallons of 80% sulfuric acid. ERRS attempted to pump the liquid out into totes for off-site disposal, but the pump was unable to lift the dense liquid high enough to pump out through the manhole.  It was decided at the time to leave the material and reassess removal options.  ERRS is currently in the process of gathering bids to assess the cheapest and most efficient method of removal.

Once the containers from around the site were ready to ship, ERRS gathered up all of the empty containers.  These empty containers have residual amounts of contamination and were cut up and also disposed of off-site.

2.1.3 Enforcement Activities, Identity of Potentially Responsible Parties (PRPs)
EPA has received consent for access to conduct assessment, stabilization and clean-up actions. EPA continues to review PRP information. 

2.1.4 Progress Metrics

Waste Stream Medium Quantity Manifest # Treatment Disposal
           
           
           


  2.2 Planning Section
    2.2.1 Anticipated Activities

2.2.1.1 Planned Response Activities

EPA will return to the site to remove the sulfuric acid from the tank and dispose of any remaining empty containers.  Upon determination of an appropriate disposal option, remobilization will be scheduled.

  2.3 Logistics Section
    No information available at this time.

  2.4 Finance Section
    No information available at this time.

  2.5 Other Command Staff
    No information available at this time.

3. Participating Entities
  South Carolina Department of Health and Environmental Control

4. Personnel On Site
  During Reporting Period

EPA - 2
ERRS - 5

5. Definition of Terms
  No information available at this time.

6. Additional sources of information
  No information available at this time.

7. Situational Reference Materials
  No information available at this time.