Wiley's Bridge Lead Site

All POL/SITREP's for this site Wiley's Bridge Lead Site
Reading, PA - EPA Region III
POLREP #30
Printer Friendly  |   PDF
 
U.S. ENVIRONMENTAL PROTECTION AGENCY
POLLUTION/SITUATION REPORT
Wiley's Bridge Lead Site - Removal Polrep

EPA Emergency Response

UNITED STATES ENVIRONMENTAL PROTECTION AGENCY
Region III

Subject: POLREP #30
Wiley's Bridge Lead Site
A3YB
Reading, PA
Latitude: 40.4421031 Longitude: -75.9274248


To:
From: Todd Richardson, On Scene Coordinator
Date: 12/20/2016
Reporting Period: 11/24/2016 - 12/22/2016

1. Introduction
  1.1 Background
   
Site Number: A3YB    Contract Number:  
D.O. Number:      Action Memo Date: 4/28/2015
Response Authority: CERCLA    Response Type: Time-Critical
Response Lead: EPA    Incident Category: Removal Action
NPL Status: Non NPL    Operable Unit:
Mobilization Date: 5/1/2014    Start Date: 5/1/2014
Demob Date:      Completion Date:  
CERCLIS ID:    RCRIS ID:
ERNS No.:    State Notification:
FPN#:    Reimbursable Account #:

1.1.1 Incident Category
Removal Action

1.1.2 Site Description

The Wiley’s Bridge Lead Site (Site), located in along Wiley’s Ln., and on the Blue Falls Grove property, on the banks of, and possibly into the Maiden Creek, is owned by the City of Reading, and the private owner(s) of the Blue Falls Grove Property.  The suspected area of concern, owned by the City of Reading appears to be an area of approximately a quarter, to a half mile along a stretch of Wiley’s Ln., on the bank of, and possibly into the Maiden Creek.  Similarly, the initial area of concern on the Blue Falls Grove property appears to extent from Wiley’s Bridge, east along the bank of the Maiden Creek, for approximately one half mile. The actual size the impacted area of the Site may change following an extent of contamination investigation.  During Site visits, adults have been observed fishing, and both adults and children have been observed swimming in affected area of Maiden Creek.  The Blue Falls Grove Property is an active 38 acre RV, camp ground, fair ground, picnic area, and event (weddings, family/company events and picnics) destination.  Families, including children, play, fish, and swim in the area of concern, and are potentially exposed to unsafe lead concentrations in the surface soil and debris at the Site.  The Site is surrounded by rural residential property, and approximately 5,000 acres owned by the City of Reading.  The Reading property consists of mostly wooded areas, with some hiking trails, and the Ontelaunee Reservoir, which serves as the public water supply for the City of Reading, and some surrounding areas.

 

The area of concern to the west of Wiley’s Bridge was investigated by the City of Reading in the early 1990’s.  The results of the investigation indicated the presence of elevated lead concentrations and battery fragments in the surface and subsurface soils.  It is not clear why the investigation did not continue, and necessary remedial action did not occur.

1.1.2.1 Location
Intersection of Wileys Ln. and Bowers Rd, Reading, PA 19605

1.1.2.2 Description of Threat

Lead-contaminated soils and soil containing lead-contaminated materials are located throughout the Site.  While there is some vegetative cover around the Site, the vegetation does not adequately cover the soil to prevent potential exposure to lead contamination, the soil and waste material is often bare or very poorly vegetated.  Residents around the Site, visitors, and trespassers onto the Site have unrestricted access to the contaminated soil areas.  Contact with the soil and subsequent incidental ingestion of contaminated soil poses a significant threat to human health of nearby populations. 

In the absence of cleanup activities, the Site poses a potential direct contact threat to human receptors (trespassers), as well as the potential for secondary contamination of private residences and businesses.  Incidental ingestion of lead in the soil or sediment at the Site may result in increased blood lead levels.  Lead is known to adversely affect the central nervous system.

The hazardous substances located in the soils at the Site include lead contaminated, exposed surface soil on an embankment, and on walking trails.  There is insufficient vegetation to prevent the migration of the contaminated soil through erosion by wind or precipitation or movement through pedestrian traffic.  Areas of erosion have been observed throughout the site. Lead contaminated soils could easily migrate downgrade to heavily used recreational areas and/or into the Maiden Creek.  

Reports indicate that RAWA has supplemantal inlets located downstream of the site. They are located approximately 3/4 mile downstream, at the RAWA water treatment plant. These supplemental intakes are used in case there is a need to either blend water from Maiden Creek with the Lake Ontelaunee water, or to exclusively use Maiden Creek water.  

1.1.3 Preliminary Removal Assessment/Removal Site Inspection Results

In May, 2014, PADEP Project Manager, Dave Hrobuchak contacted OSC Richardson regarding reports of battery fragments observed along Maiden Creek, near Wiley’s Bridge. On May 1, 2014, OSC Richardson joined PADEP Project Manager Hrobuchak for an initial assessment of the area of concern. Significant amounts of battery fragment waste was observed along Maiden Creek for about a quarter mile, on the bank of Maiden Creek. Five random discrete surface soil samples were collected and sent to a lab for analysis. Analytical results revealed lead concentrations of 15,803ppm, 23,378ppm, 33,884ppm, 55,063ppm, and 68,489ppm. All of the analytical results far exceed the area specific risk based action level of 572ppm (screening number used prior to the WBLC Actoin Memo, which establised an action level of 400ppm), established for the Price Battery Remedial Site.

 

Following the initial assessment, the EPA OSC again visited the Site. Walking along the bank of Maiden Creek, using an XRF, battery fragments and elevated lead concentrations were found not only in the initial quarter mile west of Wiley’s Bridge, but also on to the east of the Bridge, onto the Blue Falls Grove Property. ATSDR was consulted regarding the findings at the site, and support the proposed action. The City of Reading was also briefed on the concerns related the Site, and has granted EPA access to further investigate. EPA has also met with the owners of the Blue Falls Grove Property.  After consultation with their respective attorneys, both the owner and lease purchaser granted EPA access to conduct investigation, and necessary remival activities on the Blue Falls Grove Property.

 

2. Current Activities
  2.1 Operations Section
   

2.1.1 Narrative
The creek bank revetment on the City of Reading owned property was temporarily stopped and removal operations resumed in Blue Falls Grove Campground this reporting period.  No additional creek bank on RAWA property was reveted, so the total footage figures in Polrep 29 remain until we resume operations again in spring/summer.  The jersey barrier coffer dam was removed from the creek and the barriers staged in BFG.  The narrow flat strip along Wiley's Road was spread with topsoil, seeded and covered with straw matting.  All of the equipment was mobilized to BFG.  The site engineer was on site to check on site restoration activities.  All areas covered in the approved plans are being followed.   The remaining creek bank in Blue Falls Grove was cleared of brush, saplings and a few larger tree trunks topped back in the summer.  The creek bank revetment began at the east end (upstream) by the spillway and approximately 30' was completed.  The area of old discarded concrete adjacent to spillway retaining walls was broken and removed.  Battery casings were visible and they were also removed.  A new concrete pad was poured in this area.  Pavilion 5, near the former Falls Room was enclosed with tyvek building wrap and plastic sheeting, then heated with an indirect fired portable heater.  This will be primarily used to keep the water truck from freezing and storing other miscellaneous items.  The new campground owners were approached and asked if they would grant us permission to enclose said pavilion and they yes.  There were another 10 - 12 trees that were topped near pavilion 2 and the rental cottage since they will have to be removed eventually.    

2.1.2 Response Actions to Date
Removal Assessment complete
Extent of contamination investigation (near complete with exception of possible additional Maiden Creek sediment sampling)
Removal Activities:

Excavation/restoration of BFG: Falls Room Area, Rental Cottage (including the excavation and replacement of septic system). 

Maiden Creek bank clean-up activities began.

Upper campground clean-up activities (excavations) began

City of Reading Property portion of creek bank revetment continues

Sub contractor (tree service) removed all trees on creek bank for a stretch of roughly .33 miles.

Temporarily suspended operations on the RAWA property and remobilized back to Blue Falls Grove Campground.

2.1.3 Enforcement Activities, Identity of Potentially Responsible Parties (PRPs)
PRPs (property owners) have been identified.  Information request letters have been sent to PRPs.

2.1.4 Progress Metrics

Waste Stream Medium Quantity Manifest # Treatment Disposal
Contaminated soil/debris  Soil  ~35,000tons      ~14,000ton
           
           


  2.2 Planning Section
   

2.2.1 Anticipated Activities
Creek Bank removal/stabilization work

Drinking water samples
Erosion control filter sock installation
Continued clearing and grubbing
Installation of temporary coffer dams
Transport and disposal of contaminated soils


2.2.1.1 Planned Response Activities
Removal activities may include extent of contamination investigation, stabilization, cover/encapsulation, and/or excavation and disposal (or onsite waste consolidation) of identified areas of lead contamination. 

2.2.1.2 Next Steps
Conduct sediment screening/sampling activities in Maiden Creek
Continuation of clearing/grubbing activities
Continue engineering evaluation of alternatives
Evaluate removal alternatives
Revise engineering design plans (as necessary)
Begin implimentation/construction of engineered plans

2.2.2 Issues
None

  2.3 Logistics Section
    No information available at this time.

  2.4 Finance Section
    No information available at this time.

  2.5 Other Command Staff
    No information available at this time.

3. Participating Entities
  3.1 Unified Command

3.2 Cooperating Agencies
EPA, PADEP, ATSDR/CDC, City of Reading, Reading Area Water Authority (RAWA), PA Game Commission, Berks County Conservation District, PA Fish and Boat Commission, USACE, Ontelaunee Township

4. Personnel On Site
  EPA, ERRS and START contractors.

5. Definition of Terms
  No information available at this time.

6. Additional sources of information
  6.1 Internet location of additional information/report

6.2 Reporting Schedule
Weekley - Bi-Weekley

7. Situational Reference Materials
  PADEP/EPA Assessment Report